Gas Power Plant Operational

MICHELIN ARANDA Gas Power Plant | Aranda de Duero, Spain

Spain
Visit official website

Overview

MICHELIN ARANDA is a 31.9 MW gas power plant located in Aranda de Duero, Spain. Operated by ENERGYWORKS ARANDA S.L., it supplies electricity to the local grid.

MICHELIN ARANDA is a gas-fired power generation facility located in Aranda de Duero, Spain. With a capacity of 31.9 MW, it operates as a medium-scale plant within the Spanish energy sector, contributing to regional electricity supply. The plant operates under the regulatory framework of the European Union's Industrial Emissions Directive (2010/75/EU), which sets emission limits and requires the use of Best Available Techniques (BAT) for gas-fired plants. As a gas power plant, it benefits from lower CO2 emissions compared to coal-fired facilities, aligning with Spain's transition towards cleaner energy sources. Owned by ENERGYWORKS ARANDA S.L., the facility plays a role in supporting local industrial and residential electricity needs. Its location in the Castile and León region places it within an area with growing renewable energy integration, though gas plants like this provide essential grid stability and backup power.

Environmental context

As a gas-fired power plant, MICHELIN ARANDA produces lower CO2, SOx, and NOx emissions compared to coal plants, but still contributes to greenhouse gas emissions. Its location in Aranda de Duero, a town with moderate population density, means emissions may affect local air quality. The plant's relatively small capacity (31.9 MW) limits its overall environmental footprint, but compliance with EU emission standards is critical for minimizing local impacts.

Frequently asked questions

MICHELIN ARANDA is located in Aranda de Duero, in the province of Burgos, Castile and León, Spain.

MICHELIN ARANDA has a capacity of 31.9 megawatts (MW), making it a medium-scale gas power plant.

MICHELIN ARANDA is owned by ENERGYWORKS ARANDA S.L.

Gas power plants in Spain must comply with the EU Industrial Emissions Directive (2010/75/EU), which mandates emission limits and the use of Best Available Techniques (BAT) to reduce environmental impact.

MICHELIN ARANDA provides electricity to the local grid, supporting industrial and residential demand in the Castile and León region, and helps maintain grid stability as a dispatchable gas plant.
UtilityRadar
More
Press Esc to close · Browse by sector