Overview
PAPELERA GUIPUZCOANA is a 79.9 MW gas power plant located in Spain, owned by PAPELERA GUIPUZCOANA DE ZICUNAGA SA. It is operational and contributes to the country's power generation mix.
PAPELERA GUIPUZCOANA is a gas-fired power generation facility situated in Spain, with coordinates 43.2596° N, -1.9688° E. The plant has a capacity of 79.9 megawatts, placing it in the small-to-medium scale range for gas power plants in the region. It is owned and operated by PAPELERA GUIPUZCOANA DE ZICUNAGA SA and is currently in operational status. As a gas power plant, it utilizes natural gas as its primary fuel, which typically results in lower CO2 emissions compared to coal-fired plants. The facility operates under the regulatory framework of the European Union, including the Industrial Emissions Directive (2010/75/EU) and Best Available Techniques (BAT) conclusions for large combustion plants. These regulations set emission limits for SOx, NOx, and other pollutants, ensuring compliance with environmental standards. The plant's location in Spain's Basque Country region places it within an area with significant industrial activity. Its capacity of 79.9 MW suggests it may serve local industrial or community power needs, contributing to grid stability and energy security. The use of gas as a fuel aligns with Spain's transition towards lower-carbon energy sources.
Environmental context
The plant's gas-fired technology results in lower CO2 emissions per MWh compared to coal, but still contributes to greenhouse gas emissions. Its location in an industrial area may have localized air quality impacts, though EU regulations require adherence to emission limits. The moderate capacity suggests a relatively modest environmental footprint within the sector.
Frequently asked questions
PAPELERA GUIPUZCOANA is located in Spain, with coordinates 43.2596° N, -1.9688° E.
It is a gas power plant with a capacity of 79.9 MW, using natural gas as its primary fuel.
The plant is owned by PAPELERA GUIPUZCOANA DE ZICUNAGA SA.
Gas power plants in Spain must comply with the EU Industrial Emissions Directive (2010/75/EU) and Best Available Techniques (BAT) conclusions, which set emission limits for pollutants like SOx and NOx.
The plant has a capacity of 79.9 megawatts.