Geothermal Power Plant Operational

NUOVA MONTEROTONDO Geothermal Power Plant, Italy | 11 MW Facility

Italy
Visit official website

Overview

NUOVA MONTEROTONDO is an 11 MW geothermal power plant in Italy. It harnesses geothermal energy for electricity generation, contributing to the country's renewable energy portfolio.

NUOVA MONTEROTONDO is a geothermal power plant located in Italy, with coordinates 43.1519° N, 10.8495° E. It has an operational capacity of 11 MW, placing it in the small-scale range for geothermal power generation. The plant is currently operational and plays a role in Italy's renewable energy infrastructure. Geothermal power plants like NUOVA MONTEROTONDO utilize heat from the Earth's subsurface to generate electricity. Italy has a long history of geothermal energy development, particularly in regions like Tuscany. The plant operates under the European Union's Industrial Emissions Directive (2010/75/EU), which sets emission limits and requires the use of Best Available Techniques (BAT) to minimize environmental impact. As a geothermal facility, NUOVA MONTEROTONDO produces low CO2 emissions compared to fossil fuel plants, but may release trace amounts of hydrogen sulfide and other gases. Its small capacity suggests it serves local grid needs or contributes to distributed generation. The plant's location in a geothermally active area aligns with Italy's strategy to expand renewable energy sources.

Environmental context

Geothermal power generation has a low carbon footprint but can release hydrogen sulfide and other geothermal gases. The plant's location in Italy, a country with significant geothermal resources, means it operates in a region with established geothermal regulations. Its small capacity (11 MW) limits its environmental impact, though local air quality and water use are managed under EU directives.

Frequently asked questions

NUOVA MONTEROTONDO is located in Italy at coordinates 43.1519° N, 10.8495° E, in a region known for geothermal activity.

NUOVA MONTEROTONDO is a geothermal power plant that generates electricity by harnessing heat from the Earth's subsurface.

The plant has an installed capacity of 11 MW, making it a small-scale geothermal facility.

Geothermal plants in Italy must comply with the EU Industrial Emissions Directive (2010/75/EU), which mandates Best Available Techniques (BAT) to control emissions of hydrogen sulfide and other pollutants.

As a renewable energy source, NUOVA MONTEROTONDO helps Italy reduce reliance on fossil fuels and supports the country's goals for increasing renewable energy generation.
UtilityRadar
More
Press Esc to close · Browse by sector