Risk: Low Hydroelectric Power Plant Operational

Guillermo Cespedes Hydroelectric Power Plant, Rio Negro, Argentina

Argentina
Visit official website

Overview

Guillermo Cespedes is a 5.2 MW hydroelectric power plant in Rio Negro, Argentina, operated by DPA Rio Negro. It contributes to the region's renewable energy capacity.

Guillermo Cespedes is a hydroelectric power plant located in the Rio Negro province of Argentina, with an operational capacity of 5.2 MW. The facility is owned and operated by DPA Rio Negro, a provincial water and energy authority. As a small-scale hydroelectric plant, it plays a role in the local energy mix, supporting the region's electricity needs with renewable generation. The plant operates as a run-of-river or reservoir-based hydroelectric facility, typical for small hydro projects in Argentina. The country has a growing renewable energy sector, with hydroelectric power being a significant contributor. Regulatory oversight for such plants falls under national and provincial energy authorities, with environmental assessments required for water use and ecosystem impacts. Environmentally, hydroelectric power offers low direct emissions compared to fossil fuel plants. However, small hydro projects can affect local aquatic ecosystems and water flow regimes. The plant's capacity of 5.2 MW places it in the small-scale category, serving a localized area. Its operational status ensures continued contribution to the grid, supporting Argentina's renewable energy targets.

Environmental context

The plant's hydroelectric generation produces minimal greenhouse gas emissions, aligning with Argentina's renewable energy goals. However, small hydro facilities can alter river hydrology and affect aquatic habitats. The plant's location in Rio Negro province, a region with diverse ecosystems, requires careful water management to balance energy production with environmental stewardship.

Frequently asked questions

Guillermo Cespedes is located in the Rio Negro province of Argentina, near coordinates 39.56°S, 65.68°W.

The plant has an installed capacity of 5.2 megawatts (MW), classifying it as a small hydroelectric facility.

The plant is owned and operated by DPA Rio Negro, the provincial water and energy authority of Rio Negro, Argentina.

Hydroelectric plants in Argentina must comply with national environmental laws, including water use permits and environmental impact assessments. Provincial authorities like DPA Rio Negro enforce local regulations.

Small hydro plants like Guillermo Cespedes provide renewable, low-emission electricity to local grids, supporting Argentina's goal to increase renewable energy share under national energy policies.
UtilityRadar
More
Press Esc to close · Browse by sector