Risk: Low Hydroelectric Power Plant Operational

Kaprun main stage Hydroelectric Power Plant, Austria | 240 MW Facility

Austria
Visit official website

Overview

Kaprun main stage is a 240 MW hydroelectric power plant in Austria, operated by Verbund. It contributes to Austria's renewable energy grid with reliable hydropower generation.

Kaprun main stage is a hydroelectric power plant located in Austria, operated by Verbund. With a capacity of 240 MW, it is a medium-to-large scale facility within the country's hydropower sector. The plant plays a key role in Austria's renewable energy mix, leveraging the region's mountainous terrain and water resources. As a hydroelectric facility, Kaprun main stage operates without direct fuel combustion, resulting in minimal CO2, SOx, and NOx emissions. Austria's regulatory framework for hydropower includes the EU Water Framework Directive and national renewable energy targets, ensuring environmental sustainability and grid integration. The plant's operational status and capacity indicate its significance for regional electricity supply and grid stability. Hydropower plants like Kaprun main stage provide flexible generation, supporting peak demand and balancing intermittent renewables. Its location in the Austrian Alps underscores the importance of alpine hydropower for Europe's energy transition.

Environmental context

The Kaprun main stage hydroelectric plant operates in the Austrian Alps, an area with high ecological sensitivity due to alpine ecosystems and water resources. Hydropower generation here involves minimal greenhouse gas emissions compared to fossil fuel plants, but can affect local hydrology and aquatic habitats. The facility's 240 MW capacity suggests a moderate environmental footprint, with potential impacts on river flow regimes and fish migration. Austria's strict environmental regulations under the EU Water Framework Directive help mitigate these effects.

Frequently asked questions

Kaprun main stage is located in Austria, specifically in the Kaprun region of the Austrian Alps. The plant is situated at coordinates 47.259100 N, 12.738900 E.

Kaprun main stage has a capacity of 240 megawatts (MW), making it a medium-to-large hydroelectric facility in Austria.

Kaprun main stage is owned and operated by Verbund, Austria's leading electricity company and a major player in European hydropower.

Hydroelectric plants in Austria must comply with the EU Water Framework Directive, which aims to protect water quality and aquatic ecosystems. Additionally, national laws require environmental impact assessments and adherence to strict operational permits.

Kaprun main stage provides renewable, low-carbon electricity to Austria's grid, supporting the country's goal of 100% renewable electricity by 2030. Its hydropower generation offers flexibility and storage capabilities, helping balance supply and demand.
UtilityRadar
More
Press Esc to close · Browse by sector