Risk: Low Hydroelectric Power Plant Operational

Kreuzbergmaut Hydroelectric Power Plant, Austria | Verbund

Austria
Visit official website

Overview

Kreuzbergmaut is a hydroelectric power plant in Austria, operated by Verbund. With a capacity of 18 MW, it contributes to Austria's renewable energy grid.

Kreuzbergmaut is a hydroelectric power plant located in Austria, operated by the utility company Verbund. The facility has an installed capacity of 18 megawatts, placing it in the small-to-medium scale range for hydroelectric generation in the region. As a run-of-river hydroelectric plant, Kreuzbergmaut harnesses the flow of local waterways to generate electricity without significant water storage. The plant operates under Austria's regulatory framework, which aligns with EU directives on renewable energy and water protection. Hydroelectric power is a cornerstone of Austria's energy mix, accounting for a substantial share of the country's electricity production. The plant's output is fed into the Austrian grid, supporting regional energy needs and contributing to the country's renewable energy targets. By utilizing a clean, renewable resource, Kreuzbergmaut helps reduce greenhouse gas emissions and supports Austria's transition to a low-carbon energy system.

Environmental context

As a hydroelectric facility, Kreuzbergmaut produces electricity with minimal direct emissions, supporting Austria's climate goals. The plant's operation is subject to environmental regulations that ensure sustainable water use and minimal impact on aquatic ecosystems. Its location in a mountainous region may involve considerations for local biodiversity and river flow management.

Frequently asked questions

Kreuzbergmaut is located in Austria, with coordinates approximately 47.4412° N, 13.2108° E.

Kreuzbergmaut has an installed capacity of 18 megawatts (MW), classifying it as a small-to-medium scale hydroelectric facility.

The plant is operated by Verbund, a leading Austrian utility company specializing in hydroelectric power generation.

Hydroelectric plants in Austria must comply with EU water framework directives and national environmental laws, including measures to protect aquatic ecosystems and ensure sustainable water use.

Kreuzbergmaut generates renewable electricity from hydropower, supporting Austria's goal of achieving 100% renewable electricity by 2030 and reducing reliance on fossil fuels.
UtilityRadar
More
Press Esc to close · Browse by sector