Risk: Low Hydroelectric Power Plant Operational

Schwabeck Hydroelectric Power Plant, Austria | 79 MW Facility

Austria
Visit official website

Overview

Schwabeck is a 79 MW hydroelectric power plant in Austria, operated by Verbund. It contributes to Austria's renewable energy grid with clean hydropower generation.

Schwabeck is a hydroelectric power plant located in Austria, operated by Verbund, a leading energy company. With a capacity of 79 MW, it is a medium-scale hydro facility that plays a role in the country's renewable energy mix. The plant is operational and contributes to Austria's goal of generating electricity from sustainable sources. As a hydroelectric plant, Schwabeck uses the natural flow of water to generate electricity without direct fuel combustion, resulting in minimal air emissions. The technology is well-established and efficient, with typical run-of-river or reservoir configurations. Austria's regulatory framework for hydropower includes water rights and environmental impact assessments to ensure sustainable operation. Environmentally, Schwabeck provides clean energy with low carbon footprint, supporting Austria's transition to a low-carbon economy. Its location in a region with ample water resources ensures reliable generation. The plant's operation aligns with European Union directives on renewable energy and water management, contributing to grid stability and local energy security.

Environmental context

Schwabeck's hydroelectric operation produces no direct CO2, SOx, or NOx emissions, making it a low-carbon energy source. The plant's location in Austria, a country with stringent environmental regulations, ensures compliance with water quality and ecosystem protection standards. The facility's capacity of 79 MW indicates a moderate scale that minimizes landscape disruption while providing significant renewable energy to the grid.

Frequently asked questions

Schwabeck is located in Austria, with coordinates approximately 46.6580° N, 14.8726° E. It is operated by Verbund.

Schwabeck has a capacity of 79 megawatts (MW), making it a medium-scale hydroelectric facility.

Schwabeck is operated by Verbund, a major Austrian energy company specializing in hydropower and renewable energy.

Hydroelectric plants in Austria must comply with the EU Water Framework Directive and national water laws, including environmental impact assessments and measures to protect aquatic ecosystems.

Schwabeck generates clean electricity from hydropower, supporting Austria's target of 100% renewable electricity by 2030 and reducing greenhouse gas emissions.
UtilityRadar
More
Press Esc to close · Browse by sector