Risk: Low Hydroelectric Power Plant Operational

Wallsee-Mitterkirchen Hydroelectric Power Plant, Austria | Danube River Facility

Austria
Visit official website

Overview

Wallsee-Mitterkirchen is a 210 MW hydroelectric power plant in Austria, operated by Verbund. It harnesses the Danube River's flow to generate renewable electricity for the national grid.

Wallsee-Mitterkirchen is a run-of-river hydroelectric power plant located on the Danube River in Austria. With a capacity of 210 MW, it is a medium-to-large scale facility within the Austrian hydropower sector, which is a cornerstone of the country's renewable energy mix. The plant is owned and operated by Verbund, Austria's leading electricity company, and has been operational for decades. The plant utilizes the natural flow of the Danube to generate electricity through Kaplan turbines, typical for low-head hydroelectric sites. Austria's hydropower sector benefits from a robust regulatory framework aligned with EU directives, including the Water Framework Directive and the Renewable Energy Directive. The plant's technology and scale are representative of the country's strategy to maximize renewable energy generation from its alpine rivers. Environmentally, Wallsee-Mitterkirchen contributes to Austria's goal of carbon-neutral electricity generation by displacing fossil fuel-based power. Its operation is integrated with river management, including fish migration measures and sediment transport considerations. The plant plays a key role in grid stability and supplies clean electricity to thousands of households in the region.

Environmental context

As a hydroelectric plant on the Danube, Wallsee-Mitterkirchen operates within a regulated river ecosystem. The facility's environmental impact includes altered water flow and potential effects on aquatic habitats, though modern mitigation measures such as fish ladders are typically implemented. The plant's zero-emission electricity generation supports Austria's climate targets by avoiding CO2 emissions from fossil fuels. Its location in a densely populated river valley requires careful management of water levels and ecological continuity.

Frequently asked questions

The Wallsee-Mitterkirchen hydroelectric power plant is located on the Danube River in Austria, near the towns of Wallsee and Mitterkirchen in Lower Austria.

Wallsee-Mitterkirchen has an installed capacity of 210 megawatts (MW), making it a medium-to-large hydroelectric facility in Austria.

The plant is owned and operated by Verbund, Austria's largest electricity company and a major player in European hydropower.

Hydroelectric plants in Austria must comply with EU directives such as the Water Framework Directive and the Renewable Energy Directive, as well as national laws on water use, ecological flow, and fish passage.

As a renewable hydroelectric plant, Wallsee-Mitterkirchen generates clean electricity, helping Austria achieve its goal of 100% renewable electricity by 2030 and reducing reliance on fossil fuels.
UtilityRadar
More
Press Esc to close · Browse by sector