Overview
Bersimis-2 is a 869 MW hydroelectric power plant in Quebec, Canada, operated by Hydro-Québec. It is an operational facility contributing to the province's renewable energy grid.
Bersimis-2 is a hydroelectric power plant located in Quebec, Canada, with a capacity of 869 megawatts (MW). It is owned and operated by Hydro-Québec, a major utility company in the region. The plant is part of the Bersimis River hydroelectric complex and plays a significant role in Quebec's clean energy generation. As a hydroelectric facility, Bersimis-2 utilizes renewable water resources to generate electricity, producing minimal direct emissions compared to fossil fuel plants. The plant operates under Canadian and Quebec provincial regulations, which include environmental assessments and water management requirements. Hydroelectric power is a key component of Canada's energy mix, with Quebec being a leading province in hydro capacity. The plant's output supports the provincial grid, providing reliable power to residential, commercial, and industrial users. Its operation contributes to reducing greenhouse gas emissions by displacing fossil fuel-based generation. The Bersimis-2 facility is an example of large-scale hydroelectric infrastructure that leverages Quebec's abundant water resources.
Environmental context
The plant's hydroelectric nature means it has a low carbon footprint, with no direct CO2, SOx, or NOx emissions. However, the reservoir and dam can affect local aquatic ecosystems and water flow regimes. The facility is located in a forested region of Quebec, where environmental monitoring ensures compliance with provincial water management and biodiversity protection standards.
Frequently asked questions
Bersimis-2 is located in Quebec, Canada, on the Bersimis River. Its coordinates are approximately 49.1754° N, -69.2263° W.
Bersimis-2 has an installed capacity of 869 megawatts (MW), making it a large-scale hydroelectric facility.
Bersimis-2 is owned and operated by Hydro-Québec, the primary electric utility in Quebec, Canada.
Hydroelectric plants in Canada are subject to federal and provincial regulations, including the Canadian Environmental Assessment Act and provincial water management laws. These require environmental impact assessments, fish passage measures, and water flow management to minimize ecological disruption.
Bersimis-2 supports Canada's clean energy transition by generating renewable hydroelectricity, reducing reliance on fossil fuels. It helps meet provincial and federal targets for low-carbon electricity and grid reliability.