Hydroelectric Power Plant Operational

Budhil Hydroelectric Power Plant | 70 MW Facility in Himachal Pradesh, India

India
Visit official website

Overview

Budhil is a 70 MW hydroelectric power plant located in Himachal Pradesh, India. It is operational and contributes to the region's renewable energy capacity.

Budhil is a hydroelectric power plant situated in the state of Himachal Pradesh, India, with an installed capacity of 70 megawatts (MW). As a run-of-the-river project, it harnesses the flow of the Budhil River, a tributary of the Ravi River, to generate electricity. This facility is part of India's growing portfolio of renewable energy sources, supporting the country's goals for clean power generation. The plant operates under India's regulatory framework for hydropower projects, which includes environmental clearances from the Ministry of Environment, Forest and Climate Change (MoEFCC) and compliance with the Central Electricity Authority (CEA) guidelines. The 70 MW capacity places it in the small-to-medium scale for hydroelectric plants in India, which range from micro-hydro (below 25 MW) to large projects exceeding 500 MW. Typical technology for such plants includes Francis or Pelton turbines, depending on head and flow characteristics. Environmentally, hydroelectric plants like Budhil provide low-carbon electricity, reducing reliance on fossil fuels. However, they can impact local aquatic ecosystems and river flow regimes. The plant's location in the Himalayan foothills means it operates in a region with high biodiversity and seasonal monsoon variations. Its operational status ensures a steady supply of renewable energy to the northern grid, supporting both local communities and industrial demand.

Environmental context

The Budhil hydroelectric plant is located in the Himalayan region of Himachal Pradesh, an area characterized by steep terrain, high rainfall, and rich biodiversity. As a run-of-the-river project, it has a relatively lower environmental footprint compared to reservoir-based dams, but it still alters river flow patterns and can affect aquatic habitats. The plant's 70 MW capacity contributes to India's renewable energy mix, displacing carbon emissions from fossil fuel-based generation. Proximity to forested areas and wildlife corridors necessitates careful environmental management to mitigate impacts on local ecosystems.

Frequently asked questions

The Budhil hydroelectric plant is located in the state of Himachal Pradesh, India, near the Budhil River, a tributary of the Ravi River.

The Budhil hydroelectric plant has an installed capacity of 70 megawatts (MW).

Budhil is a run-of-the-river hydroelectric plant, which means it does not have a large reservoir and relies on the natural flow of the river to generate electricity.

Hydroelectric plants in India must comply with regulations from the Ministry of Environment, Forest and Climate Change (MoEFCC) for environmental clearances, and the Central Electricity Authority (CEA) for technical standards. They also adhere to state-level water use policies.

As a renewable energy source, Budhil helps India reduce its dependence on fossil fuels and supports the national target of achieving 500 GW of non-fossil fuel capacity by 2030.
UtilityRadar
More
Press Esc to close · Browse by sector