Overview
Upper Sileru I&II is a 240 MW hydroelectric power plant in India. It operates as a run-of-river facility, contributing to the region's renewable energy capacity.
Upper Sileru I&II is a hydroelectric power plant located in India, with a total installed capacity of 240 MW. The facility is operational and plays a key role in harnessing the hydro potential of the Sileru River basin. As a run-of-river project, it generates electricity without significant water storage, aligning with sustainable hydropower practices. The plant operates under India's regulatory framework for hydropower, which includes environmental clearance from the Ministry of Environment, Forest and Climate Change (MoEFCC) and compliance with the Dam Safety Act. The 240 MW capacity places it in the medium-to-large scale category for Indian hydroelectric projects. Typical technology for such plants includes Francis or Kaplan turbines, depending on head and flow conditions. Upper Sileru I&II contributes to India's renewable energy goals by providing clean, low-carbon electricity to the grid. Its operation supports regional energy security and reduces dependence on fossil fuels. The plant's location in a hilly region also influences local water management and ecosystem dynamics, though specific environmental impacts are managed through regulatory compliance.
Environmental context
The plant's hydroelectric operation produces no direct CO2, SOx, or NOx emissions, offering a low-carbon energy source. However, the construction and operation of hydropower facilities can affect local aquatic ecosystems and river flow regimes. The Sileru River basin supports diverse flora and fauna, and the plant's run-of-river design minimizes reservoir-related impacts. Proximity to populated areas is limited due to the hilly terrain, reducing exposure to air quality concerns.
Frequently asked questions
Upper Sileru I&II is located in India, on the Sileru River. The plant's coordinates are approximately 18.03° N, 82.02° E.
Upper Sileru I&II has a total installed capacity of 240 megawatts (MW), making it a medium-to-large scale hydroelectric plant in India.
While specific turbine details are not publicly listed, typical hydroelectric plants of this scale use Francis or Kaplan turbines, depending on the head and flow characteristics of the river.
Hydroelectric projects in India require environmental clearance from the Ministry of Environment, Forest and Climate Change (MoEFCC) and must comply with the Dam Safety Act. They also undergo environmental impact assessments to address ecological and social concerns.
Upper Sileru I&II generates clean, renewable electricity, supporting India's target of 500 GW non-fossil fuel capacity by 2030. It reduces reliance on coal-fired power and helps lower greenhouse gas emissions.