Overview
Cikalong/Saguling is a 19.2 MW hydroelectric power plant in Indonesia, operated by PLN - PT. Indonesia Power. It contributes to the country's renewable energy capacity.
Cikalong/Saguling is a hydroelectric power plant located in Indonesia, with a capacity of 19.2 MW. The facility is owned and operated by PLN - PT. Indonesia Power, the state-owned electricity company. As a hydroelectric plant, it harnesses the flow of water to generate electricity, supporting Indonesia's energy mix with renewable power. Indonesia's power generation sector is regulated by the Ministry of Energy and Mineral Resources, with environmental oversight from the Ministry of Environment and Forestry. Hydroelectric plants like Cikalong/Saguling are subject to national environmental impact assessment requirements and water usage permits. The plant's relatively small capacity places it in the small-scale hydro category, typical for run-of-river or reservoir-based projects in the region. The plant's operational status is confirmed as operational, and it plays a role in supplying electricity to the local grid. Hydroelectric power is a key component of Indonesia's strategy to increase renewable energy share, reducing reliance on fossil fuels. The facility's location in West Java near the Saguling reservoir may also provide secondary benefits such as water management and irrigation support.
Environmental context
As a hydroelectric plant, Cikalong/Saguling produces electricity with minimal direct air emissions, contributing to lower CO2, SOx, and NOx footprints compared to fossil fuel plants. However, hydro projects can affect local aquatic ecosystems and water flow regimes. The plant's capacity of 19.2 MW suggests a relatively small-scale operation, which may reduce its environmental footprint. Proximity to populated areas and the Saguling reservoir requires careful management of water levels and downstream impacts.
Frequently asked questions
The Cikalong/Saguling hydroelectric power plant is located in Indonesia, near the Saguling reservoir in West Java.
The Cikalong/Saguling power plant has a capacity of 19.2 megawatts (MW).
The plant is owned and operated by PLN - PT. Indonesia Power, the state-owned electricity company in Indonesia.
Hydroelectric plants in Indonesia must comply with national environmental impact assessment (AMDAL) requirements and obtain water usage permits from the Ministry of Environment and Forestry.
Hydroelectric power is a renewable energy source that helps Indonesia reduce its reliance on fossil fuels, supporting the country's target to increase the share of renewables in its energy mix.