Hydroelectric Power Plant Operational

Granja do Tedo Hydroelectric Power Plant, Portugal | 2.2 MW Facility

Portugal
Visit official website

Overview

Granja do Tedo is a 2.2 MW hydroelectric power plant in Portugal. It operates as a run-of-river facility, contributing to the country's renewable energy mix.

Granja do Tedo is a hydroelectric power plant located in Portugal, with a capacity of 2.2 MW. As a small-scale facility, it plays a role in the local energy grid, harnessing the power of flowing water to generate electricity. The plant is operational and contributes to Portugal's renewable energy portfolio. The plant operates under Portugal's national energy regulations, which align with EU directives on renewable energy and emissions. Hydroelectric plants like Granja do Tedo are typically run-of-river or small reservoir systems, with low environmental impact compared to fossil fuel plants. The technology involves turbines driven by water flow, with no direct CO2 emissions during operation. Granja do Tedo supports Portugal's goal of increasing renewable energy capacity. Its small size means it serves a local or regional grid, providing clean energy without significant land use or water consumption issues. The plant's operation is consistent with sustainable energy practices in the region.

Environmental context

As a hydroelectric plant, Granja do Tedo produces electricity without direct CO2, SOx, or NOx emissions, making it a low-carbon energy source. Its small capacity (2.2 MW) minimizes land and water footprint. The plant is likely located in a rural or semi-rural area, with minimal impact on populated zones. Hydroelectric facilities can affect local aquatic ecosystems, but run-of-river designs typically have lower ecological disruption than large dams.

Frequently asked questions

Granja do Tedo is located in Portugal, at coordinates 41.064200, -7.614800.

The Granja do Tedo hydroelectric plant has a capacity of 2.2 megawatts (MW).

Granja do Tedo is a hydroelectric power plant, likely a run-of-river facility, which generates electricity from flowing water without significant storage.

Hydroelectric plants in Portugal must comply with EU renewable energy directives and national water resource laws, including environmental impact assessments and grid connection standards.

Granja do Tedo adds to Portugal's renewable energy capacity, supporting the country's target of carbon neutrality by 2050 and reducing reliance on fossil fuels.
UtilityRadar
More
Press Esc to close · Browse by sector