Overview
Túneis is a 1.7 MW hydroelectric power plant located in Portugal. It contributes to the country's renewable energy portfolio by generating electricity from hydropower.
Túneis is a hydroelectric power plant situated in Portugal, with a capacity of 1.7 MW. This facility is part of Portugal's efforts to harness renewable energy sources, specifically hydropower, to meet its electricity demands. The plant is currently operational, supporting the local grid with clean energy. As a small-scale hydroelectric facility, Túneis operates under Portugal's national energy regulations, which align with EU directives on renewable energy and environmental protection. The plant's technology is typical for run-of-river or small reservoir hydro projects, which have minimal environmental footprint compared to larger dams. The environmental significance of Túneis lies in its contribution to reducing greenhouse gas emissions by displacing fossil fuel-based generation. Its small capacity means it serves a local or niche role in the regional energy mix, providing reliable baseload power without significant ecological disruption.
Environmental context
The plant's hydroelectric nature implies low direct emissions, but its environmental impact depends on local hydrology and ecosystem. In Portugal, hydropower is a key renewable source, and small-scale plants like Túneis typically have limited effects on water flow and aquatic life. The facility's location in a region with moderate rainfall supports consistent operation.
Frequently asked questions
Túneis is located in Portugal, with coordinates approximately 37.7465° N, -25.3072° W.
The Túneis hydroelectric plant has a capacity of 1.7 megawatts (MW).
Túneis is a hydroelectric power plant, generating electricity from flowing water.
Hydroelectric plants in Portugal must comply with EU renewable energy directives and national water resource laws, including environmental impact assessments and operational permits.
Yes, Túneis is listed as operational.