Hydroelectric Power Plant Operational

PENA DE BEJO Hydroelectric Power Plant, Spain | 20.8 MW Renewable Energy Facility

Spain
Visit official website

Overview

PENA DE BEJO is a 20.8 MW hydroelectric power plant in Spain, operated by SALTOS DEL NANSA I S.A. UNIPERSONAL. The facility is currently operational and contributes to the country's renewable energy generation.

PENA DE BEJO is a hydroelectric power plant located in Spain, with a capacity of 20.8 MW. The facility is owned and operated by SALTOS DEL NANSA I S.A. UNIPERSONAL and is currently in operational status. As a hydroelectric plant, it harnesses the energy of flowing water to generate electricity, contributing to Spain's renewable energy mix. The plant operates under the regulatory framework of the European Union, including the Industrial Emissions Directive 2010/75/EU, which sets standards for environmental performance. Hydroelectric power plants like PENA DE BEJO are considered low-emission sources, as they produce electricity without direct combustion of fossil fuels. The facility's capacity of 20.8 MW places it in the small-to-medium scale range for hydroelectric plants in Spain. Environmentally, hydroelectric power generation has a relatively low carbon footprint compared to fossil fuel-based plants. However, it can impact local aquatic ecosystems and water flow regimes. The plant's location in Spain, a country with diverse geography and water resources, supports its role in providing renewable energy to the grid. The facility's operational status ensures continued contribution to the region's energy supply and sustainability goals.

Environmental context

Hydroelectric power generation, such as at PENA DE BEJO, produces electricity without direct CO2, SOx, or NOx emissions, making it a low-carbon energy source. However, the facility may affect local aquatic ecosystems and water flow patterns. The plant's capacity of 20.8 MW is moderate, and its operation in Spain aligns with the country's renewable energy targets. The environmental impact is generally lower than fossil fuel plants, but site-specific factors like river ecology and sediment transport should be considered.

Frequently asked questions

PENA DE BEJO is a hydroelectric power plant located in Spain, at coordinates 43.150400, -4.381700.

PENA DE BEJO has a capacity of 20.8 megawatts (MW), making it a small-to-medium scale hydroelectric facility.

PENA DE BEJO is owned and operated by SALTOS DEL NANSA I S.A. UNIPERSONAL.

Hydroelectric plants in Spain operate under EU directives, including the Industrial Emissions Directive 2010/75/EU, and national water and energy regulations. They must comply with environmental impact assessments and water use permits.

Hydroelectric power is a low-carbon energy source but can affect aquatic ecosystems, water flow, and sediment transport. Proper management and mitigation measures are required to minimize ecological disruption.
UtilityRadar
More
Press Esc to close · Browse by sector