Overview
SAU 2 is a 55.56 MW hydroelectric power plant in Spain, operated by ENDESA GENERACION S.A. It contributes to the country's renewable energy capacity.
SAU 2 is a hydroelectric power plant located in Spain, with a capacity of 55.56 MW. The facility is owned and operated by ENDESA GENERACION S.A., a major energy company in the region. As a hydroelectric plant, it harnesses the energy of flowing water to generate electricity, supporting Spain's renewable energy goals. The plant operates under Spain's regulatory framework, which aligns with EU directives such as the Industrial Emissions Directive and promotes renewable energy sources. Hydroelectric plants like SAU 2 typically use turbines to convert water flow into electricity, with efficiency depending on water availability and head height. The 55.56 MW capacity places it in the small-to-medium scale for hydroelectric power. SAU 2 plays a role in Spain's energy mix by providing clean, renewable electricity. Its operation contributes to reducing greenhouse gas emissions compared to fossil fuel plants. The facility's location in a region with suitable water resources ensures reliable power generation, supporting local grid stability and community energy needs.
Environmental context
Hydroelectric power generation has a low carbon footprint but can affect local aquatic ecosystems and water flow regimes. The SAU 2 plant's operation may influence downstream water levels and fish migration patterns. Its location in Spain, a country with varying precipitation, means water availability can impact generation capacity. The plant's relatively small size reduces its environmental footprint compared to larger hydroelectric projects.
Frequently asked questions
SAU 2 is a hydroelectric power plant located in Spain, with coordinates 41.9470 N, 2.3844 E.
SAU 2 has a capacity of 55.56 megawatts (MW), making it a small-to-medium scale hydroelectric facility.
SAU 2 is owned and operated by ENDESA GENERACION S.A., a major Spanish energy company.
Hydroelectric plants in Spain must comply with EU directives such as the Industrial Emissions Directive and national water management laws, ensuring environmental protection and sustainable operation.
SAU 2 generates renewable electricity, helping Spain reduce reliance on fossil fuels and meet EU renewable energy targets.