Overview
Ardtornish Estate-Upgrade to existing is a 1.5 MW hydroelectric power plant in the United Kingdom. Operated by Ardtornish Estate, it is an operational facility generating renewable energy.
Ardtornish Estate-Upgrade to existing is a hydroelectric power plant located in the United Kingdom, with a capacity of 1.5 MW. The facility is owned and operated by Ardtornish Estate and is currently operational. As a small-scale hydroelectric plant, it contributes to the local renewable energy supply. The plant operates under the regulatory framework of the United Kingdom, which includes the Electricity Act 1989 and the Renewables Obligation (RO) scheme. Hydroelectric power plants in the UK are subject to environmental regulations such as the Water Framework Directive and the Environmental Permitting Regulations. The technology typically involves turbines driven by flowing water, with minimal emissions compared to fossil fuel plants. The facility plays a role in supporting the UK's transition to low-carbon energy. By generating electricity from hydropower, it helps reduce reliance on fossil fuels and contributes to grid stability. The plant's small capacity suggests it serves local or community-scale energy needs, aligning with the UK's goals for decentralized renewable generation.
Environmental context
Hydroelectric power generation has a low carbon footprint but can affect local aquatic ecosystems. The Ardtornish Estate plant, with a capacity of 1.5 MW, is small-scale and likely run-of-river, minimizing reservoir-related impacts. Its location in a rural area reduces exposure to population centers. The UK's regulatory framework requires environmental assessments and compliance with the Water Framework Directive to protect water quality and biodiversity.
Frequently asked questions
The Ardtornish Estate-Upgrade to existing hydroelectric power plant is located in the United Kingdom, at coordinates 56.5583 N, -5.6873 W.
The Ardtornish Estate-Upgrade to existing hydroelectric plant has a capacity of 1.5 megawatts (MW).
The plant is owned and operated by Ardtornish Estate.
Hydroelectric plants in the UK must comply with the Electricity Act 1989, the Renewables Obligation, and environmental regulations such as the Water Framework Directive and Environmental Permitting Regulations.
Hydroelectric power generates electricity with low carbon emissions, reducing reliance on fossil fuels. Small-scale run-of-river plants like Ardtornish Estate have minimal environmental impact compared to large dams.