Nuclear Power Plant Operational

ASCO GR Nuclear Power Plant | Spain Power Generation Facility

Spain
Visit official website

Overview

ASCO GR is a nuclear power plant in Spain with a capacity of 1990.5 MW, operated by ENDESA GENERACION S.A. It is an operational facility contributing to the country's baseload power generation.

ASCO GR is a nuclear power plant located in Spain, operated by ENDESA GENERACION S.A. With a capacity of 1990.5 MW, it is a large-scale facility within the Spanish power generation sector, providing reliable baseload electricity to the grid. The plant operates under Spain's regulatory framework, which aligns with European Union directives, including the Industrial Emissions Directive (2010/75/EU) and Best Available Techniques (BAT) conclusions for nuclear power generation. Nuclear plants in Spain are subject to stringent safety and environmental oversight by the Nuclear Safety Council (CSN). As a nuclear facility, ASCO GR produces low-carbon electricity, contributing to Spain's decarbonization goals. Its operation supports grid stability and reduces reliance on fossil fuels, though it involves management of radioactive waste and cooling water discharges. The plant's location in the Tarragona province places it near the Ebro River, influencing local water use and thermal discharge considerations.

Environmental context

The plant's nuclear fuel cycle results in minimal greenhouse gas emissions during operation, but it generates radioactive waste requiring long-term management. Cooling water for the plant is sourced from the Ebro River, with thermal discharge potentially affecting local aquatic ecosystems. The facility's location in a moderately populated area necessitates robust emergency planning and radiation monitoring.

Frequently asked questions

ASCO GR is located in Spain, near the Ebro River in the Tarragona province. Its coordinates are approximately 41.2008° N, 0.5679° E.

ASCO GR has a capacity of 1990.5 MW, making it a large-scale nuclear power plant in Spain.

ASCO GR is owned and operated by ENDESA GENERACION S.A., a major Spanish utility company.

Nuclear power plants in Spain operate under the oversight of the Nuclear Safety Council (CSN) and comply with European Union directives, including the Industrial Emissions Directive and Best Available Techniques conclusions for nuclear energy.

ASCO GR produces low-carbon electricity but generates radioactive waste requiring long-term storage. Its cooling system uses water from the Ebro River, with thermal discharge potentially impacting local aquatic life.
UtilityRadar
More
Press Esc to close · Browse by sector