Risk: Medium Distribution Pump Station Operational

City of Terre Haute Phase 1 Project 1-3 Improvements at Main Lift Station - Distribution Pump Station in Terre Haute, Indiana

TERRE HAUTE, Indiana, United States

Overview

The City of Terre Haute Phase 1 Project 1-3 Improvements at Main Lift Station is an operational distribution pump station in Terre Haute, Indiana, serving the local wastewater infrastructure.

The City of Terre Haute Phase 1 Project 1-3 Improvements at Main Lift Station is a distribution pump station located at the intersection of Prairieton Road and I-70 in Terre Haute, Indiana. This facility is part of the city's wastewater collection system, designed to transport sewage from lower to higher elevations for treatment. As a lift station, it plays a critical role in maintaining sanitary sewer flow in the Vigo County area. The facility operates under the regulatory framework of the United States Clean Water Act and Indiana Department of Environmental Management (IDEM) standards for wastewater collection and treatment. Lift stations of this type typically include pumps, motors, controls, and backup power systems to ensure reliable operation. The improvements under Phase 1 Project 1-3 likely involved upgrades to increase capacity, enhance energy efficiency, or meet current regulatory requirements. Environmental significance lies in its role in preventing sanitary sewer overflows (SSOs) and protecting local water quality. By efficiently conveying wastewater to the treatment plant, the lift station reduces the risk of untreated discharges into the Wabash River and surrounding waterways. This infrastructure supports public health and environmental compliance in the Terre Haute community.

Environmental context

The facility is situated near the Wabash River, a major tributary of the Ohio River. Proper operation of this lift station is essential to prevent sewer overflows that could impact local aquatic ecosystems and recreational water uses. The region's flat topography and clay soils make lift stations necessary for maintaining gravity flow in the collection system. Regulatory oversight by IDEM ensures compliance with discharge permits and spill prevention plans.

Frequently asked questions

The facility is located at the intersection of Prairieton Road and I-70 in Terre Haute, Indiana, USA.

This distribution pump station lifts wastewater from lower elevations to higher elevations for conveyance to the treatment plant, ensuring proper flow in the sewer system.

The improvements likely included upgrades to pumps, controls, and electrical systems to increase capacity, reliability, and compliance with current environmental regulations.

Lift stations in Indiana must comply with the Clean Water Act, IDEM rules for wastewater collection systems, and local ordinances regarding sewer overflows and maintenance.

By preventing sanitary sewer overflows, the lift station protects the Wabash River and local waterways from untreated sewage, supporting aquatic health and recreational use.

Other Distribution Pump Station plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector