Overview
UWCD/EL RIO BOOSTER PLANT is a distribution pump station in El Rio, California, serving the Ventura County water supply network. It operates under U.S. water utility regulations and supports local potable water distribution.
The UWCD/EL RIO BOOSTER PLANT is a distribution pump station located at 3561 Rose Ave in El Rio, California, within Ventura County. As part of the United Water Conservation District's infrastructure, it plays a role in maintaining water pressure and flow for the region's potable water system. The facility is operational and classified under NAICS 221310, which covers water supply and irrigation systems. While specific technical specifications such as flow capacity are not detailed in available records, the plant operates within California's stringent water management framework, including state regulations on water conservation and distribution system reliability. Distribution pump stations of this type typically include electric motor-driven pumps, backup power systems, and automated controls to ensure consistent service. The plant's location in El Rio, near the coast, places it within a region subject to seasonal drought conditions, making efficient water distribution critical. Its role in the local water grid supports residential, agricultural, and industrial users, contributing to community resilience and water security in Ventura County.
Environmental context
The facility operates in a Mediterranean climate zone with periodic drought stress, emphasizing the importance of reliable water distribution. As a booster station, it helps maintain system pressure and reduces energy consumption compared to direct pumping from distant sources. The plant's operations are subject to California's Sustainable Groundwater Management Act and local water efficiency programs, which influence pumping schedules and maintenance practices.
Frequently asked questions
The UWCD/EL RIO BOOSTER PLANT is located at 3561 Rose Ave, El Rio, California 93030, in Ventura County, United States.
It is a distribution pump station that boosts water pressure to maintain adequate flow in the potable water distribution system serving the El Rio area and surrounding communities.
The plant is part of the United Water Conservation District (UWCD) infrastructure, which manages water resources in Ventura County.
These facilities must comply with California's water supply regulations, including the California Water Code, Title 22 drinking water standards, and local mechanical/electrical safety codes. They also fall under the Sustainable Groundwater Management Act (SGMA) for groundwater sustainability.
The NAICS code is 221310, which covers water supply and irrigation systems, including water treatment and distribution.
Other Distribution Pump Station plants in United States · 6 nearby