Overview
Neuvy-en-Dunois is an operational onshore wind farm in France with a capacity of 24 MW, contributing to the country's renewable energy targets under the EU Renewable Energy Directive.
Neuvy-en-Dunois is an onshore wind farm located in the Centre-Val de Loire region of France. With a capacity of 24 MW, it is a medium-scale facility that supports France's transition to renewable energy. The wind farm is operational and contributes to the local energy grid. The facility operates under France's national regulatory framework, which aligns with the EU Renewable Energy Directive III (2023/2413), targeting 42.5% renewable energy by 2030. France supports wind energy through feed-in tariffs and grid connection guarantees, encouraging projects like Neuvy-en-Dunois to integrate into the energy mix. Environmentally, the wind farm helps reduce greenhouse gas emissions by displacing fossil fuel-based electricity. Its location in a rural area minimizes land-use conflicts, though wind farms can have visual impacts and affect local bird and bat populations. The facility's grid connection supports regional energy stability.
Environmental context
The wind farm is situated in an agricultural region of central France, where land use is primarily for crops and pasture. Onshore wind projects in such areas can have visual impacts on the landscape and may affect local bird and bat populations through collisions. However, proper siting and mitigation measures are typically employed to minimize ecological disruption. The facility contributes to France's renewable energy goals and reduces reliance on fossil fuels.
Frequently asked questions
The Neuvy-en-Dunois wind farm is located in the Centre-Val de Loire region of France, near the commune of Neuvy-en-Dunois.
The Neuvy-en-Dunois wind farm has a capacity of 24 megawatts (MW), making it a medium-scale onshore wind installation.
Neuvy-en-Dunois is an onshore wind farm that generates electricity from wind energy, a renewable source.
The wind farm contributes to France's target under the EU Renewable Energy Directive III, which aims for 42.5% renewable energy by 2030. It benefits from national feed-in tariffs and grid connection policies.
Onshore wind farms like Neuvy-en-Dunois can have visual impacts on landscapes and may affect bird and bat populations. French regulations require environmental impact assessments and mitigation measures to minimize these effects.