Overview
Windpark Hakenstedt is an operational onshore wind farm in Germany with a capacity of 82.7 MW, contributing to the country's renewable energy transition under the EU Renewable Energy Directive.
Windpark Hakenstedt is an operational onshore wind farm located in Germany, with a total capacity of 82.7 MW. The facility is owned by Umspannwerke Druxberge GmbH & Co. KG, managed through Windstrom GmbH, and plays a role in the regional energy grid. As a medium-to-large scale wind farm, it aligns with Germany's ambitious renewable energy targets. The wind farm operates under Germany's regulatory framework, which is shaped by the EU Renewable Energy Directive III (2023/2413), targeting 42.5% renewable energy by 2030. Germany supports wind energy through feed-in tariffs and grid connection guarantees under the Renewable Energy Sources Act (EEG). The 82.7 MW capacity places Windpark Hakenstedt among significant contributors to the country's onshore wind capacity, which is a key pillar of the Energiewende. Environmentally, the wind farm helps reduce greenhouse gas emissions by displacing fossil fuel-based electricity. Its location in the Saxony-Anhalt region benefits from consistent wind resources. The facility's operations are subject to environmental impact assessments addressing bird and bat collisions, noise, and visual landscape effects, with mitigation measures typically required under German law.
Environmental context
The wind farm is situated in the Saxony-Anhalt region, characterized by agricultural plains and moderate wind speeds. Onshore wind farms in this area can impact local bird and bat populations through collision risks, and visual intrusion on the landscape is a common concern. German regulations require environmental impact assessments and often mandate measures such as curtailment during migration periods or installation of deterrent systems to minimize ecological effects.
Frequently asked questions
Windpark Hakenstedt is located in Germany, near the town of Hakenstedt in Saxony-Anhalt, at coordinates 52.1663 N, 11.2847 E.
Windpark Hakenstedt has an installed capacity of 82.7 megawatts (MW), making it a medium-to-large onshore wind farm.
The wind farm is owned by Umspannwerke Druxberge GmbH & Co. KG, managed via Windstrom GmbH.
The wind farm operates under Germany's Renewable Energy Sources Act (EEG) and the EU Renewable Energy Directive III, which sets a 42.5% renewable energy target by 2030.
Environmental impact assessments address bird and bat collisions, noise, and visual impact. Mitigation measures like curtailment during migration are typically required.