Overview
Alto da Folgorosa is an 18 MW onshore wind farm located in Portugal. It contributes to the country's renewable energy capacity, supporting the EU's 2030 renewable energy targets.
Alto da Folgorosa is an operational onshore wind farm in Portugal, with a capacity of 18 MW. The facility is part of Portugal's growing wind energy sector, which plays a key role in the country's renewable energy mix. The wind farm operates under Portugal's national renewable energy framework, aligned with the EU Renewable Energy Directive III, which sets a 42.5% renewable target by 2030. Portugal has implemented feed-in tariffs and grid connection policies to support wind energy development. Alto da Folgorosa contributes to local clean energy generation, reducing reliance on fossil fuels. Its operation supports grid stability and helps Portugal meet its climate goals. The facility's location in a windy region optimizes energy production.
Environmental context
Onshore wind farms like Alto da Folgorosa can have visual impacts on landscapes and may affect bird and bat populations. Proper siting and mitigation measures are important to minimize ecological disruption. The facility operates in a region with moderate wind resources, supporting efficient energy generation.
Frequently asked questions
Alto da Folgorosa is an onshore wind farm located in Portugal, at coordinates 39.1347 N, -9.1322 W.
Alto da Folgorosa has a capacity of 18 MW, making it a medium-scale wind farm in Portugal.
Alto da Folgorosa generates electricity from wind energy using onshore wind turbines.
Portugal's wind energy sector is supported by the EU Renewable Energy Directive III, which mandates a 42.5% renewable energy share by 2030, and national feed-in tariffs and grid connection policies.
Alto da Folgorosa adds 18 MW of clean wind power to Portugal's grid, helping reduce carbon emissions and supporting the country's transition to renewable energy.