Overview
Cabeço Alto is an operational onshore wind farm in Portugal with a capacity of 11.7 MW, contributing to the country's renewable energy portfolio.
Cabeço Alto is an operational onshore wind farm located in Portugal, with a capacity of 11.7 MW. This facility is part of Portugal's growing renewable energy sector, which has been expanding under the EU Renewable Energy Directive and national targets. The wind farm utilizes wind power to generate electricity, supporting the country's goal of achieving 80% renewable electricity by 2030. The facility operates under Portugal's feed-in tariff regime and benefits from the EU's Renewable Energy Directive III, which sets a binding target of 42.5% renewable energy by 2030. Onshore wind farms like Cabeço Alto are a key technology in Portugal's energy mix, leveraging the country's favorable wind conditions, particularly in northern and central regions. The 11.7 MW capacity places it in the small-to-medium scale range for onshore wind. Environmentally, Cabeço Alto contributes to reducing greenhouse gas emissions by displacing fossil fuel-based electricity. Wind farms in Portugal are typically sited to minimize visual and land-use impacts, though they can affect local bird and bat populations. The facility's grid integration is supported by Portugal's modern transmission infrastructure, which accommodates variable renewable sources.
Environmental context
Portugal's wind farms, including Cabeço Alto, are often located in rural or mountainous areas with strong wind resources. These sites can have visual impacts on landscapes and may affect local bird and bat populations through collisions. However, proper siting and mitigation measures are typically employed to reduce ecological disruption. The facility's operation supports Portugal's transition to a low-carbon energy system.
Frequently asked questions
Cabeço Alto is an onshore wind farm located in Portugal, with coordinates approximately 41.876° N, 7.836° W.
Cabeço Alto has a capacity of 11.7 megawatts (MW), making it a small-to-medium scale wind farm.
Cabeço Alto generates electricity from wind power using onshore wind turbines.
Portugal's wind energy sector is supported by the EU Renewable Energy Directive III, which mandates 42.5% renewable energy by 2030, and national feed-in tariffs and grid connection policies.
Cabeço Alto adds 11.7 MW of wind capacity, helping Portugal achieve its target of 80% renewable electricity by 2030 and reducing reliance on fossil fuels.