Overview
Raposeira is an operational onshore wind farm in Portugal with a capacity of 5.5 MW, contributing to the country's renewable energy goals under the EU Renewable Energy Directive.
Raposeira is an onshore wind farm located in Portugal, operating with a capacity of 5.5 MW. As a wind energy facility, it plays a role in Portugal's transition to renewable energy sources, supporting the national target of 80% renewable electricity by 2030. The facility operates under Portugal's regulatory framework, which aligns with the EU Renewable Energy Directive III (2023/2413) aiming for 42.5% renewable energy by 2030. Portugal's feed-in tariff system and grid connection policies have historically supported wind energy development, making onshore wind a mature technology in the country. Raposeira's environmental significance lies in its contribution to reducing greenhouse gas emissions. Wind farms in Portugal typically operate in areas with favorable wind resources, and their integration into the grid helps stabilize renewable energy supply. The facility supports local energy needs and aligns with broader European climate objectives.
Environmental context
Onshore wind farms like Raposeira are typically sited in areas with consistent wind patterns, often in coastal or elevated regions. In Portugal, wind energy development considers visual impact and land use, with turbines placed to minimize disruption to local ecosystems. Bird and bat interactions are managed through careful site selection and monitoring, ensuring compliance with environmental regulations.
Frequently asked questions
Raposeira wind farm is located in Portugal, with coordinates approximately 37.0964 N, -8.8617 W.
Raposeira wind farm has a capacity of 5.5 MW, making it a small-scale onshore wind facility.
The operator of Raposeira wind farm is not publicly listed, but it is operational and contributes to Portugal's renewable energy grid.
Portugal's wind energy sector is supported by the EU Renewable Energy Directive III, which sets a 42.5% renewable energy target by 2030, and national feed-in tariffs and grid connection policies.
Wind farms like Raposeira reduce greenhouse gas emissions but require careful siting to minimize visual and ecological impacts, including bird and bat interactions.