Overview
São Macário II is an operational onshore wind farm in Portugal with a capacity of 23 MW, contributing to the country's renewable energy goals under the EU Renewable Energy Directive.
São Macário II is an onshore wind farm located in Portugal, with coordinates approximately 40.99°N, -7.96°W. The facility has an installed capacity of 23 megawatts and is currently operational, playing a role in Portugal's transition to renewable energy sources. The wind farm utilizes wind turbines to generate electricity, a common technology in Portugal's renewable energy mix. Portugal has been a leader in renewable energy, with a strong regulatory framework aligned with the EU Renewable Energy Directive III, which sets a target of 42.5% renewable energy by 2030. The country benefits from favorable wind conditions, particularly in inland and coastal regions. Environmentally, onshore wind farms like São Macário II contribute to reducing greenhouse gas emissions but can have local impacts such as visual landscape changes and potential effects on bird and bat populations. The facility supports Portugal's grid integration of renewables and helps meet national energy demands sustainably.
Environmental context
Onshore wind farms in Portugal are typically sited in areas with consistent wind resources, which may include upland or rural landscapes. These installations can alter visual aesthetics and require careful planning to minimize impacts on local wildlife, particularly birds and bats. The environmental context of São Macário II involves balancing renewable energy generation with land-use considerations, typical for wind energy projects in the region.
Frequently asked questions
São Macário II is an onshore wind farm located in Portugal, with approximate coordinates 40.99°N, -7.96°W.
São Macário II has an installed capacity of 23 megawatts, making it a medium-scale wind farm in the Portuguese context.
The operator of São Macário II is not publicly listed, but the facility is operational and contributes to Portugal's renewable energy grid.
Wind farms in Portugal operate under the EU Renewable Energy Directive III, which mandates a 42.5% renewable energy target by 2030, supported by national feed-in tariffs and grid connection policies.
Onshore wind farms like São Macário II can impact local landscapes and wildlife, particularly birds and bats. Environmental assessments are typically required to mitigate these effects.