Overview
Vila Nova II is an operational onshore wind farm in Portugal with a capacity of 28.6 MW, contributing to the country's renewable energy targets under the EU Renewable Energy Directive.
Vila Nova II is an operational onshore wind farm located in Portugal, with coordinates 40.0537° N, -8.2523° W. The facility has a capacity of 28.6 MW, placing it in the medium-scale range for wind farms in the region. It operates under Portugal's regulatory framework aligned with the EU Renewable Energy Directive III, which sets a 42.5% renewable energy target by 2030. The wind farm utilizes onshore wind turbines to generate electricity, feeding into the national grid. Portugal has a strong wind energy sector, supported by feed-in tariffs and grid connection regimes. The facility's capacity factor and specific turbine details are not disclosed, but typical onshore wind farms in Portugal achieve capacity factors around 25-30%. Vila Nova II plays a role in Portugal's transition to renewable energy, reducing reliance on fossil fuels and contributing to decarbonization. The wind farm's location in central Portugal benefits from consistent wind resources, supporting grid stability and local energy needs. Its operational status ensures ongoing clean energy generation.
Environmental context
The wind farm is situated in a region with moderate wind resources, typical for onshore wind development in Portugal. Environmental considerations include potential visual impact on the landscape and effects on local bird and bat populations. The facility operates under Portuguese environmental regulations that require mitigation measures such as turbine curtailment during migration periods and proper siting to minimize ecological disruption.
Frequently asked questions
Vila Nova II is an onshore wind farm located in Portugal, at coordinates 40.0537° N, -8.2523° W.
Vila Nova II has a capacity of 28.6 MW, making it a medium-scale wind farm in Portugal.
Yes, Vila Nova II is currently operational and generating electricity from wind power.
Wind farms in Portugal operate under the EU Renewable Energy Directive III, which mandates a 42.5% renewable energy share by 2030, supported by national feed-in tariffs and grid connection policies.
Onshore wind farms can have visual impacts on landscapes and affect bird and bat populations. Mitigation measures include careful siting, curtailment during migration, and environmental monitoring.