Overview
P. E. Boqueron Unificado is an operational onshore wind farm in Spain, with a capacity of 49.5 MW, owned by Compania Eolica Aragonesa S.A.
P. E. Boqueron Unificado is an onshore wind farm located in Spain, owned and operated by Compania Eolica Aragonesa S.A. The facility has a capacity of 49.5 MW, placing it in the medium-scale range for wind energy in Spain. It is currently operational, contributing to the country's renewable energy portfolio. The wind farm utilizes modern wind turbine technology to convert wind energy into electricity. Spain has a robust regulatory framework supporting renewable energy, including the EU Renewable Energy Directive III, which sets a target of 42.5% renewable energy by 2030. The facility operates under Spain's national feed-in tariff and grid-connection regimes, which have historically incentivized wind power development. Environmentally, the facility helps reduce greenhouse gas emissions by displacing fossil fuel-based electricity generation. Wind farms in Spain are typically sited in areas with favorable wind resources, and this facility's location in the Aragon region benefits from consistent wind patterns. The project supports Spain's transition to a low-carbon energy system and contributes to local energy independence.
Environmental context
The facility is located in the Aragon region of Spain, an area with significant wind resources that support efficient energy generation. Onshore wind farms like this one can have visual impacts on the landscape and may affect local bird and bat populations. However, proper siting and mitigation measures are typically employed to minimize these effects. The project contributes to reducing reliance on fossil fuels and lowering carbon emissions.
Frequently asked questions
P. E. Boqueron Unificado is an onshore wind farm located in Spain, specifically in the Aragon region. The exact coordinates are 41.8341 N, -1.5327 W.
The wind farm has a capacity of 49.5 megawatts (MW), which is typical for a medium-scale onshore wind installation in Spain.
The facility is owned by Compania Eolica Aragonesa S.A., a Spanish company involved in wind energy development.
Spain operates under the EU Renewable Energy Directive III, which mandates a 42.5% renewable energy share by 2030. The country also has national feed-in tariffs and grid-connection policies that have historically supported wind power growth.
By generating electricity from wind, the facility displaces fossil fuel-based power, reducing greenhouse gas emissions and supporting Spain's renewable energy targets.