Onshore Wind Farm Operational

P. E. Castilfrio Onshore Wind Farm, Spain | Renewable Energy Facility

Spain
Visit official website

Overview

P. E. Castilfrio is an operational onshore wind farm in Spain, owned by CIA. EOLICA TIERRAS ALTAS S.A. (CETASA), with a capacity of 24.75 MW.

P. E. Castilfrio is an onshore wind farm located in Spain, owned and operated by CIA. EOLICA TIERRAS ALTAS S.A. (CETASA). The facility is operational and contributes to the country's renewable energy capacity with a nameplate capacity of 24.75 MW. This scale places it as a medium-sized wind farm within the Spanish renewable energy landscape. The wind farm utilizes wind turbines to convert kinetic energy into electricity, a technology well-established in Spain. Spain has been a leader in wind energy, supported by national renewable energy targets and the European Union's Renewable Energy Directive III, which sets a 42.5% renewable energy share by 2030. The facility operates under Spain's regulatory framework, which includes feed-in tariffs and grid connection guarantees for renewable projects. Environmentally, the wind farm contributes to reducing greenhouse gas emissions by displacing fossil fuel-based electricity generation. Its location in the Castile and León region, known for its windy conditions, optimizes energy production. The facility also supports local energy independence and aligns with Spain's goal of achieving carbon neutrality by 2050.

Environmental context

The wind farm is situated in a region with consistent wind patterns, typical for onshore wind development in Spain. Wind energy projects like this one can have visual impacts on the landscape and may affect local bird and bat populations. However, modern turbine designs and siting practices aim to minimize these effects. The facility's operation displaces fossil fuel generation, contributing to improved air quality and reduced carbon emissions in the region.

Frequently asked questions

P. E. Castilfrio is an onshore wind farm located in Spain, with coordinates approximately 41.9461° N, -2.2822° E.

The wind farm has a nameplate capacity of 24.75 MW, making it a medium-scale wind energy facility.

The facility is owned by CIA. EOLICA TIERRAS ALTAS S.A. (CETASA), a Spanish company specializing in wind energy.

Spain's renewable energy sector operates under national targets aligned with the EU Renewable Energy Directive III, which mandates 42.5% renewable energy by 2030. The country offers feed-in tariffs and priority grid access for wind power.

By generating clean electricity, the wind farm reduces reliance on fossil fuels, cutting greenhouse gas emissions and supporting Spain's transition to a carbon-neutral economy by 2050.
UtilityRadar
More
Press Esc to close · Browse by sector