Parque Eolico Cruz de Hierro is an operational onshore wind farm in Spain with a capacity of 14.52 MW, contributing to the country's renewable energy goals under the EU Renewable Energy Directive.

Parque Eolico Cruz de Hierro is an operational onshore wind farm located in Spain, with coordinates approximately 40.72°N, -4.45°W. The facility has a capacity of 14.52 MW, placing it in the small-to-medium scale range for Spanish wind farms. It is owned by Parque Eolico Altos del Voltoya S.A. and contributes to the regional energy mix. The facility operates under Spain's national renewable energy framework, which aligns with the EU Renewable Energy Directive III (2023/2413), targeting 42.5% renewable energy by 2030. Spain has a mature wind energy sector, supported by feed-in tariffs and grid connection regulations. The 14.52 MW capacity indicates a modest installation, typical for inland wind projects in the region. Environmentally, the wind farm helps reduce carbon emissions by displacing fossil fuel generation. Its location in central Spain may involve considerations for local wildlife, particularly birds and bats, though specific impacts are not detailed. The facility supports Spain's transition to a low-carbon economy and enhances energy security through domestic renewable generation.

Environmental context

The wind farm is situated in a region with a continental climate, where wind resources are moderate. Onshore wind farms like this one can have visual impacts on the landscape and potential effects on local bird and bat populations. However, proper siting and mitigation measures are typically required under Spanish environmental regulations to minimize ecological disruption.

Frequently asked questions

Parque Eolico Cruz de Hierro is located in Spain, with approximate coordinates 40.72°N, -4.45°W.

The wind farm has a capacity of 14.52 MW, which is considered small-to-medium scale for onshore wind projects in Spain.

The facility is owned by Parque Eolico Altos del Voltoya S.A., a Spanish company involved in wind energy development.

Spain's renewable energy sector operates under the EU Renewable Energy Directive III, which sets a 42.5% renewable target by 2030. National feed-in tariffs and grid connection regulations support wind farm development.

Onshore wind farms in Spain must address visual impact, noise, and potential effects on bird and bat populations. Environmental impact assessments are required to mitigate these issues.