Overview
Hazlehead is an operational onshore wind farm in the United Kingdom, owned by Banks Renewables. With a capacity of 6 MW, it contributes to the country's renewable energy portfolio.
Hazlehead is an operational onshore wind farm located in the United Kingdom, owned by Banks Renewables. With a capacity of 6 MW, it is a small-scale wind energy facility that supports the UK's transition to low-carbon electricity generation. The facility operates under the UK's regulatory framework, which includes the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO) mechanism. These policies incentivize renewable energy deployment and grid integration. Onshore wind is a mature technology in the UK, with many farms ranging from 5 MW to over 100 MW. Hazlehead's electricity is fed into the national grid, contributing to local energy needs and reducing reliance on fossil fuels. The site's location in a rural area minimizes visual impact, while modern turbine designs incorporate measures to reduce bird and bat collisions. The facility supports the UK's target of net-zero emissions by 2050.
Environmental context
The Hazlehead wind farm is situated in a rural landscape, typical of many UK onshore wind installations. The area's wind resource is favorable for energy generation. Environmental considerations include potential visual impact on the countryside and effects on local wildlife, particularly birds and bats. However, modern turbine siting and operational curtailment help mitigate these risks. The facility contributes to reducing greenhouse gas emissions and supports the UK's renewable energy targets.
Frequently asked questions
Hazlehead wind farm is located in the United Kingdom, with coordinates approximately 53.5316° N, -1.7312° W.
Hazlehead wind farm is owned by Banks Renewables, a UK-based renewable energy developer.
Hazlehead wind farm has a capacity of 6 MW, making it a small-scale onshore wind facility.
The UK supports onshore wind through the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO), which provide financial incentives for renewable electricity generation.
Hazlehead wind farm generates clean electricity, reducing greenhouse gas emissions. It also helps the UK meet its renewable energy targets and net-zero emissions goal by 2050.