Overview
Lissett is a 29.95 MW onshore wind farm in the United Kingdom, operated by Novera Energy. It contributes to the UK's renewable energy capacity under the Contracts for Difference (CfD) regime.
Lissett is an operational onshore wind farm located in the United Kingdom, developed and owned by Novera Energy. With a capacity of 29.95 MW, it represents a medium-scale wind energy facility within the UK's diverse renewable portfolio. The site benefits from the UK's strong wind resources, particularly in the eastern regions, and supports the national grid with clean electricity. The facility operates under the UK's regulatory framework for renewable energy, which includes the Contracts for Difference (CfD) scheme that provides stable revenue for low-carbon generation. Onshore wind farms like Lissett are a mature technology in the UK, contributing to the country's target of net-zero emissions by 2050. The plant's capacity is typical for onshore wind projects in the region, which often range from 10 to 50 MW. Environmentally, Lissett plays a role in reducing greenhouse gas emissions by displacing fossil fuel-based electricity. Onshore wind farms can have local impacts such as visual effects on the landscape and potential interactions with bird and bat populations, but these are managed through planning conditions and environmental monitoring. The facility's electricity output helps meet regional demand and supports the UK's transition to a sustainable energy system.
Environmental context
The Lissett wind farm is situated in a rural area of East Yorkshire, a region with moderate wind speeds suitable for wind energy generation. The local landscape is primarily agricultural, and the turbines may have visual impacts on the surrounding countryside. Potential effects on bird and bat species are considered during planning, with mitigation measures such as curtailment during peak migration periods. The facility contributes to reducing carbon emissions and supports the UK's renewable energy targets.
Frequently asked questions
Lissett wind farm is located in the United Kingdom, near the village of Lissett in East Yorkshire. The site coordinates are approximately 54.0071 N, -0.2885 W.
Lissett wind farm has a total installed capacity of 29.95 MW, generated by multiple onshore wind turbines. This is a medium-scale wind farm typical for the UK.
Lissett wind farm is owned and operated by Novera Energy, a renewable energy company active in the UK. The facility has been operational since its commissioning.
The UK supports onshore wind through the Contracts for Difference (CfD) scheme, which provides guaranteed prices for low-carbon electricity. Projects must also obtain planning permission and comply with environmental assessments.
Onshore wind farms in the UK must undergo environmental impact assessments covering visual amenity, noise, and wildlife impacts, particularly birds and bats. Mitigation measures are often required to minimize ecological effects.