Overview
Sibelco Brassington is an operational onshore wind farm in the United Kingdom with a capacity of 2.3 MW, owned by Sibelco/Golconda.
Sibelco Brassington is an onshore wind farm located in the United Kingdom, with a capacity of 2.3 MW. The facility is owned by Sibelco/Golconda and is currently operational, contributing to the country's renewable energy generation. The wind farm operates under the UK's regulatory framework, which includes the Contracts for Difference (CfD) scheme supporting low-carbon electricity. Onshore wind is a mature technology in the UK, with projects typically ranging from small single turbines to large clusters. The 2.3 MW capacity places Sibelco Brassington in the small-scale category. This facility plays a role in the local grid by supplying clean electricity, helping to reduce carbon emissions. Its operation aligns with the UK's target of achieving net-zero emissions by 2050, supporting the transition to a sustainable energy system.
Environmental context
Onshore wind farms like Sibelco Brassington contribute to reducing greenhouse gas emissions but can have local environmental impacts. These include visual effects on the landscape, noise from turbine operation, and potential risks to bird and bat populations through collisions. Proper siting and mitigation measures are essential to minimize these effects while harnessing wind energy.
Frequently asked questions
Sibelco Brassington is an onshore wind farm located in the United Kingdom, with coordinates approximately 53.09°N, -1.63°E.
Sibelco Brassington has a capacity of 2.3 megawatts (MW), making it a small-scale onshore wind farm.
Sibelco Brassington is owned by Sibelco/Golconda, a joint venture between Sibelco and Golconda.
Onshore wind in the UK is supported by the Contracts for Difference (CfD) scheme, which provides stable revenue for low-carbon electricity generation, and the UK's net-zero emissions target by 2050.
Onshore wind farms can have visual impacts on landscapes, noise from turbines, and risks to birds and bats. Mitigation measures include careful siting, turbine design, and operational curtailments during sensitive periods.