Risk: Low Solar PV Operational

Vilo Solar PV Plant | Bulgaria Renewable Energy Facility

Bulgaria
Visit official website

Overview

Vilo is a 3.9 MW solar PV facility located in Bulgaria. The plant is operational and contributes to the country's renewable energy capacity.

Vilo is a solar photovoltaic (PV) power plant located in Bulgaria, with a capacity of 3.9 megawatts (MW). The facility is operational and represents a small-scale solar installation within the country's renewable energy sector. The plant operates under Bulgaria's national regulatory framework, which aligns with the European Union's Renewable Energy Directive III (2023/2413), targeting a 42.5% renewable energy share by 2030. Bulgaria has implemented feed-in tariffs and grid connection regimes to support solar PV development, making projects like Vilo viable contributors to the national grid. As a solar PV facility, Vilo generates clean electricity without direct emissions, supporting Bulgaria's transition to a low-carbon energy system. Its relatively small capacity allows for easier grid integration and local community benefit, though land use and visual impact are typical considerations for solar installations.

Environmental context

Solar PV installations like Vilo have a low environmental footprint during operation, with no air or water emissions. However, land use for solar panels can affect local ecosystems and agricultural land. In Bulgaria, solar farms are often sited on non-arable land to minimize conflict. The facility's location in a rural area likely supports biodiversity if managed with native vegetation.

Frequently asked questions

The Vilo solar PV plant is located in Bulgaria, with coordinates approximately 44.0420° N, 27.0160° E.

The Vilo solar plant has a capacity of 3.9 megawatts (MW), making it a small-scale solar photovoltaic facility.

The Vilo plant uses solar photovoltaic (PV) technology to convert sunlight into electricity.

Bulgaria's solar PV sector operates under the EU Renewable Energy Directive III, which sets a 42.5% renewable energy target by 2030, supported by national feed-in tariffs and grid connection policies.

The Vilo plant adds 3.9 MW of solar capacity to Bulgaria's grid, helping the country meet its renewable energy targets under EU directives.