Risk: Low Solar PV Operational

Ledenice Solar Power Plant - 1.4 MW Solar PV Facility in Czech Republic

Czech Republic
Visit official website

Overview

Ledenice Solar Power Plant is a 1.4 MW solar PV facility in the Czech Republic, owned by Save Energy. The plant contributes to the country's renewable energy capacity under the EU Renewable Energy Directive.

Ledenice Solar Power Plant is a solar photovoltaic facility located in the Czech Republic, with a capacity of 1.4 MW. Owned by Save Energy, the plant is operational and supports the country's transition to renewable energy sources. As a small-scale solar installation, it reflects the growing distributed generation trend in Central Europe. The Czech Republic has been expanding its solar capacity under the EU Renewable Energy Directive III, which sets a 42.5% renewable target by 2030. The plant benefits from national feed-in tariffs and grid-connection regimes that incentivize small-to-medium solar projects. Solar PV technology in the region typically uses polycrystalline or monocrystalline panels mounted on ground or rooftops. Environmentally, the plant contributes to reducing greenhouse gas emissions and diversifying the energy mix. Its modest scale minimizes land-use impact, and solar PV generally has low operational emissions. The facility supports local energy independence and aligns with EU climate goals.

Environmental context

Solar PV plants like Ledenice have minimal environmental impact during operation, with no emissions or water use. The main considerations are land use and visual impact, which are limited for a 1.4 MW facility. In the Czech Republic, solar installations are often sited on agricultural land or brownfields, balancing energy production with landscape preservation.

Frequently asked questions

Ledenice Solar Power Plant is located in the Czech Republic, at coordinates 48.9233 N, 14.6321 E.

The plant has a capacity of 1.4 megawatts (MW), making it a small-scale solar photovoltaic facility.

The plant is owned by Save Energy, a company active in the renewable energy sector.

The Czech Republic operates under the EU Renewable Energy Directive III, targeting 42.5% renewable energy by 2030, with national feed-in tariffs and grid connection support for solar PV.

Solar PV plants have low operational emissions and minimal water use. Land use and visual impact are the primary considerations, but small-scale facilities like Ledenice have limited footprint.
UtilityRadar
More
Press Esc to close · Browse by sector