Solar PV Operational

Suchohrdly Solar Power Plant - 2.1 MW Solar PV Facility in Czech Republic

Czech Republic
Visit official website

Overview

Suchohrdly Solar Power Plant is a 2.1 MW operational solar PV facility in the Czech Republic, owned by Cellesta - N. It contributes to the country's renewable energy capacity under the EU Renewable Energy Directive.

Suchohrdly Solar Power Plant is a solar photovoltaic facility located near Suchohrdly in the Czech Republic. With a capacity of 2.1 MW, it is a small-scale solar installation that feeds renewable electricity into the local grid. The plant is owned by Cellesta - N and is currently operational, supporting the Czech Republic's transition to cleaner energy sources. The facility operates under the regulatory framework of the European Union's Renewable Energy Directive III (2023/2413), which sets a target of 42.5% renewable energy by 2030. The Czech Republic has implemented national support mechanisms, including feed-in tariffs and green bonuses, to encourage solar PV development. Suchohrdly Solar Power Plant benefits from these policies, which have driven growth in small-to-medium-scale solar installations across the country. Environmentally, the plant contributes to reducing greenhouse gas emissions by displacing fossil fuel-based electricity generation. Solar PV systems have minimal operational emissions and require no water for cooling, making them a low-impact renewable energy source. The facility's location in the South Moravian Region, known for its sunny climate, optimizes energy generation while utilizing land that may have limited alternative use.

Environmental context

The South Moravian Region of the Czech Republic experiences a continental climate with moderate solar irradiance, suitable for solar PV generation. The plant's operation avoids air pollutants and carbon emissions associated with conventional power plants. Solar installations like this one have a small land footprint and can be integrated into agricultural or marginal lands, minimizing land-use conflicts. The facility supports local energy independence and aligns with EU climate goals.

Frequently asked questions

Suchohrdly Solar Power Plant is located near the village of Suchohrdly in the South Moravian Region of the Czech Republic.

The plant has a capacity of 2.1 megawatts (MW), making it a small-scale solar photovoltaic installation.

The plant is owned by Cellesta - N, a company involved in renewable energy projects.

Solar PV in the Czech Republic is supported by the EU Renewable Energy Directive III, which mandates a 42.5% renewable energy target by 2030, and national policies such as feed-in tariffs and green bonuses.

The plant generates electricity without emitting greenhouse gases or air pollutants, reducing reliance on fossil fuels and contributing to climate change mitigation.
UtilityRadar
More
Press Esc to close · Browse by sector