Solar PV Operational

Clermont-Ferrand Solar PV Facility | 4.9 MW in France

France
Visit official website

Overview

Clermont-Ferrand is a 4.9 MW solar PV facility located in Clermont-Ferrand, France. It is operational and contributes to France's renewable energy capacity under the EU Renewable Energy Directive.

Clermont-Ferrand is a solar photovoltaic (PV) facility located in Clermont-Ferrand, France, with a capacity of 4.9 MW. This scale places it in the small-to-medium range for solar PV installations in the country, typical of ground-mounted or rooftop arrays serving local energy needs. The facility operates under France's regulatory framework, which aligns with the EU Renewable Energy Directive III (2023/2413) targeting 42.5% renewable energy by 2030. France supports solar PV through feed-in tariffs and grid connection mechanisms, encouraging distributed generation. The Clermont-Ferrand plant benefits from these policies, contributing to the national renewable energy mix. Environmentally, the solar PV facility generates clean electricity without direct emissions, reducing reliance on fossil fuels. Its location in the Auvergne-Rhône-Alpes region, known for its varied terrain, allows for solar energy generation that supports local grid stability and community energy goals. The plant's operation aligns with France's commitment to decarbonization and energy transition.

Environmental context

Solar PV installations like Clermont-Ferrand have a low environmental footprint during operation, with no air or water emissions. However, land use for solar arrays can impact local ecosystems and agriculture. In the Auvergne-Rhône-Alpes region, careful siting is important to minimize visual and land-use conflicts. The facility's moderate capacity reduces its overall land requirement, balancing renewable energy generation with environmental stewardship.

Frequently asked questions

The Clermont-Ferrand solar PV facility is located in Clermont-Ferrand, France, in the Auvergne-Rhône-Alpes region.

The Clermont-Ferrand solar plant has a capacity of 4.9 MW, making it a small-to-medium scale solar PV installation.

The facility uses solar photovoltaic (PV) technology, which converts sunlight directly into electricity.

The plant operates under France's implementation of the EU Renewable Energy Directive III, which sets a 42.5% renewable energy target by 2030. It benefits from feed-in tariffs and grid connection policies.

Solar PV has minimal operational emissions, but land use can affect local ecosystems. The facility's moderate capacity helps reduce its environmental footprint while supporting clean energy generation.
UtilityRadar
More