Overview
Durance is an operational solar PV facility in France with a capacity of 11.79 MW. It contributes to the country's renewable energy generation under the EU Renewable Energy Directive.
Durance is a solar photovoltaic (PV) facility located in France, with an operational status and a capacity of 11.79 MW. This scale places it in the small-to-medium range for solar farms in the region, supporting local and national renewable energy targets. The facility operates under France's regulatory framework, which aligns with the EU Renewable Energy Directive III (2023/2413), targeting 42.5% renewable energy by 2030. France supports solar PV through feed-in tariffs and grid connection mechanisms, encouraging distributed generation and utility-scale projects like Durance. As a solar PV installation, Durance generates electricity without direct emissions, contributing to grid decarbonization. Its location in southwestern France benefits from favorable solar irradiation, and the facility helps reduce reliance on fossil fuels while supporting France's energy transition goals.
Environmental context
Solar PV facilities like Durance have a low environmental footprint during operation, with no air or water emissions. However, land use for solar arrays can impact local ecosystems and agriculture. In France, regulations require environmental impact assessments to minimize habitat disruption. The facility's location in a rural area may involve trade-offs between renewable energy generation and land preservation.
Frequently asked questions
The Durance solar PV facility is located in France, with coordinates approximately 44.1574° N, 0.1634° E.
The Durance solar plant has a capacity of 11.79 megawatts (MW), making it a small-to-medium scale solar installation.
Durance uses solar photovoltaic (PV) technology, which converts sunlight directly into electricity.
Durance operates under France's implementation of the EU Renewable Energy Directive, benefiting from feed-in tariffs and grid connection policies that support solar PV deployment.
Solar PV facilities have minimal operational emissions but require land use. In France, environmental assessments ensure that projects like Durance mitigate impacts on local ecosystems.