Overview
La Teronde is a 7.1 MW solar PV facility located in France. It is operational and contributes to the country's renewable energy capacity under the EU Renewable Energy Directive.
La Teronde is a solar photovoltaic (PV) facility located in France, with a capacity of 7.1 megawatts. The plant is operational and forms part of France's growing solar energy infrastructure, which supports national and EU renewable energy targets. The facility operates under France's regulatory framework aligned with the EU Renewable Energy Directive III (2023/2413), which sets a 42.5% renewable energy target by 2030. Solar PV plants of this scale are typical for distributed generation in France, often connected to the grid under feed-in tariff or contract-for-difference schemes. As a solar PV installation, La Teronde contributes to reducing greenhouse gas emissions and diversifying France's energy mix. Its location in southern France benefits from high solar irradiance, supporting efficient energy generation. The facility plays a role in local grid stability and renewable energy integration.
Environmental context
Solar PV installations like La Teronde have a low environmental footprint during operation, with no emissions or water use. However, land use for solar farms can impact local ecosystems and agriculture. In France, solar projects are subject to environmental impact assessments to minimize habitat disruption and ensure sustainable siting. The facility's location in a region with high solar potential maximizes energy yield while balancing land-use considerations.
Frequently asked questions
La Teronde is a solar PV facility located in France, with coordinates approximately 44.0987° N, 4.0279° E.
La Teronde has a capacity of 7.1 megawatts (MW), making it a medium-scale solar PV installation.
The operator of La Teronde is not publicly listed, but the facility is part of France's solar energy infrastructure managed under national renewable energy policies.
La Teronde operates under France's implementation of the EU Renewable Energy Directive III, which mandates a 42.5% renewable energy share by 2030, supported by feed-in tariffs and grid access guarantees.
La Teronde generates clean electricity from solar power, reducing reliance on fossil fuels and helping France meet its national and EU renewable energy targets.