Overview
Le Robert is a 4.2 MW operational solar PV facility in France. It contributes to the country's renewable energy capacity under the EU Renewable Energy Directive.
Le Robert is a solar photovoltaic (PV) facility located in France, with an operational status and a capacity of 4.2 MW. This scale places it in the small-to-medium range for solar installations in the country, which has a diverse mix of renewable energy sources including wind, solar, and hydropower. As a solar PV plant, Le Robert converts sunlight directly into electricity using semiconductor technology. France's renewable energy sector operates under the EU Renewable Energy Directive III (2023/2413), which sets a target of 42.5% renewable energy by 2030. The country also implements national feed-in tariffs and grid-connection regimes to support solar deployment. The facility's electricity is fed into the French grid, contributing to the decarbonization of the energy mix. Solar PV plants like Le Robert help reduce greenhouse gas emissions and support France's energy transition goals, though they require land use and can have visual impacts on the local landscape.
Environmental context
Solar PV facilities like Le Robert require land for panel installation, which can affect local ecosystems and land use. In France, solar farms are often sited on agricultural or brownfield land to minimize conflicts. The facility's location in a tropical climate (Martinique) benefits from high solar irradiance, but also faces challenges such as hurricane risk and potential impacts on local biodiversity.
Frequently asked questions
Le Robert is a solar PV facility located in France, with coordinates 14.675000, -60.942600, placing it in the overseas department of Martinique.
Le Robert has an installed capacity of 4.2 megawatts (MW), making it a small-to-medium scale solar photovoltaic installation.
Le Robert uses solar photovoltaic (PV) technology, which converts sunlight directly into electricity using semiconductor panels.
France's solar energy sector operates under the EU Renewable Energy Directive III (2023/2413), which mandates a 42.5% renewable energy target by 2030, along with national feed-in tariffs and grid connection policies.
Le Robert generates clean electricity, reducing reliance on fossil fuels and helping France meet its EU-mandated renewable energy targets. Solar PV plants like this are key to decarbonizing the power grid.