Overview
Legé is a 1.29 MW operational solar PV facility in France, contributing to the country's renewable energy capacity under the EU Renewable Energy Directive III framework.
Legé is a solar photovoltaic (PV) facility located in France, with an operational capacity of 1.29 MW. As a small-scale solar installation, it supports France's transition to renewable energy, aligning with national targets to increase solar generation. The facility is part of a broader network of distributed solar assets that help diversify the energy mix. The plant operates under France's regulatory framework, which implements the EU Renewable Energy Directive III (2023/2413), targeting 42.5% renewable energy by 2030. France supports solar PV through feed-in tariffs and grid connection mechanisms, encouraging small to medium-scale projects like Legé. The facility's capacity of 1.29 MW places it in the small-scale category, typical for ground-mounted or rooftop installations in rural areas. Environmentally, Legé contributes to reducing greenhouse gas emissions by displacing fossil fuel generation. Solar PV has minimal operational emissions, though land use and visual impact are considerations. The facility's location in western France benefits from moderate solar irradiance, and its grid connection supports local energy needs. As part of France's renewable portfolio, Legé helps meet regional renewable energy targets and reduces dependence on imported energy.
Environmental context
Solar PV installations like Legé have a low environmental footprint during operation, with no air or water emissions. However, land use for solar arrays can affect local ecosystems and agricultural land. In France, solar farms are often sited on degraded or non-agricultural land to minimize impact. The facility's small scale reduces visual and land-use concerns, and its operation displaces carbon-intensive electricity, supporting climate goals.
Frequently asked questions
The Legé solar PV facility is located in France, with coordinates approximately 46.9006° N, -1.5788° E.
The Legé solar plant has an installed capacity of 1.29 MW, making it a small-scale solar photovoltaic installation.
Solar PV in France operates under the EU Renewable Energy Directive III, which sets a 42.5% renewable energy target by 2030. France implements feed-in tariffs and grid connection policies to support solar development.
Legé contributes to France's renewable energy goals by generating clean electricity from solar power, reducing reliance on fossil fuels and helping meet national and EU renewable energy targets.
Solar PV facilities produce electricity with zero operational emissions, reducing greenhouse gases and air pollution. They also have low water usage compared to conventional power plants.