Solar PV Operational

Calvörde Solar Power Plant - 1.3 MW Solar PV Facility in Germany

Germany
Visit official website

Overview

Calvörde Solar Power Plant is a 1.3 MW solar PV facility located in Calvörde, Germany. It is operational and contributes to the country's renewable energy capacity.

The Calvörde Solar Power Plant is a solar photovoltaic facility located in Calvörde, Germany. With a capacity of 1.3 MW, it is a small-scale solar installation that supports Germany's transition to renewable energy. The plant is operational and contributes to the local energy grid. Germany's renewable energy sector is governed by the Renewable Energy Sources Act (EEG), which provides feed-in tariffs and grid access for solar power. The country aims to achieve 80% renewable electricity by 2030, and small-scale solar plants like Calvörde play a role in this target. Solar PV technology converts sunlight directly into electricity, and the plant's capacity is typical for a community-scale installation. The Calvörde Solar Power Plant helps reduce greenhouse gas emissions by displacing fossil fuel-based electricity. It also contributes to energy independence and local job creation. As part of Germany's Energiewende (energy transition), such facilities are integral to the country's long-term sustainability goals.

Environmental context

Solar PV plants like Calvörde have a low environmental impact during operation, with no emissions or water use. However, land use for solar arrays can affect local ecosystems. In Calvörde, the plant is likely sited on previously developed or agricultural land, minimizing ecological disruption. Germany's strong regulatory framework ensures environmental assessments are conducted to mitigate any negative effects.

Frequently asked questions

Calvörde Solar Power Plant is located in Calvörde, Germany, at coordinates 52.3847° N, 11.3071° E.

The Calvörde Solar Power Plant has a capacity of 1.3 megawatts (MW), making it a small-scale solar photovoltaic installation.

The operator of Calvörde Solar Power Plant is not publicly listed, but it is operational and connected to the German grid.

Germany's Renewable Energy Sources Act (EEG) provides feed-in tariffs and priority grid access for solar power, supporting plants like Calvörde.

The plant contributes to Germany's target of 80% renewable electricity by 2030 by generating clean energy and reducing fossil fuel dependence.
UtilityRadar
More
Press Esc to close · Browse by sector