Overview
Alapur is a 50 MW solar PV facility located in India. It is operational and contributes to the country's renewable energy capacity.
Alapur is a solar photovoltaic (PV) power plant located in India, with a capacity of 50 megawatts (MW). The facility is operational and plays a role in India's growing renewable energy sector, which is supported by national targets and policies such as the National Solar Mission. The plant uses solar PV technology to convert sunlight into electricity. With a capacity of 50 MW, it falls into the medium-scale category for solar farms in India. The facility operates under India's regulatory framework, which includes renewable purchase obligations (RPOs) and competitive bidding mechanisms for solar power. The electricity generated by Alapur is fed into the regional grid, helping to meet local energy demand and reduce reliance on fossil fuels. Solar PV plants like this one contribute to India's goal of achieving 500 GW of non-fossil fuel capacity by 2030, supporting energy security and climate commitments.
Environmental context
Solar PV plants like Alapur have a low environmental footprint during operation, with no emissions or water consumption. However, they require significant land area, which can impact local ecosystems and land use. In India, solar farms are often sited in arid or semi-arid regions to minimize conflicts with agriculture. The facility's location in a rural area likely involves land-use trade-offs, but the overall environmental benefit from displacing fossil fuel generation is substantial.
Frequently asked questions
The Alapur solar PV plant is located in India at coordinates 20.2750° N, 75.7850° E, in the state of Maharashtra.
The Alapur solar plant has a capacity of 50 megawatts (MW), making it a medium-scale solar PV facility.
The operator of the Alapur solar plant is not publicly specified, but it is operational and connected to the Indian grid.
India's solar PV sector is supported by the National Solar Mission, renewable purchase obligations (RPOs), and competitive bidding for tariffs. The government aims for 500 GW of non-fossil fuel capacity by 2030.
The Alapur plant adds 50 MW of solar capacity, helping India meet its renewable energy targets and reduce carbon emissions from fossil fuel generation.