Solar PV Operational

Alladurg Solar PV Plant: 11 MW Operational Facility in India

India
Visit official website

Overview

Alladurg is an 11 MW operational solar PV facility in India, contributing to the country's renewable energy capacity under national solar targets.

Alladurg is an operational solar photovoltaic (PV) facility located in India, with a capacity of 11 megawatts. This scale places it within the small-to-medium range for solar installations in the country, which has rapidly expanded its solar fleet to over 70 GW. The facility operates under India's ambitious renewable energy framework, which targets 500 GW of non-fossil fuel capacity by 2030. Solar PV is the dominant technology in this push, supported by national policies such as the Jawaharlal Nehru National Solar Mission and state-level renewable purchase obligations. The 11 MW capacity indicates a utility-scale installation, likely connected to the grid under a power purchase agreement. As a solar PV plant, Alladurg generates electricity with zero direct emissions, supporting India's climate goals under the Paris Agreement. Its operational status ensures ongoing contribution to the regional grid, reducing reliance on coal-fired power. The facility also aligns with India's goal of achieving 40% installed capacity from non-fossil fuels by 2030.

Environmental context

Solar PV installations like Alladurg have a low environmental footprint during operation, with no water consumption or air emissions. However, land use for solar farms can impact local ecosystems, particularly in arid or semi-arid regions. In India, solar development often occurs on wasteland or agricultural land, requiring careful siting to minimize habitat disruption. The facility's location in a region with high solar insolation maximizes energy yield while avoiding conflicts with sensitive habitats.

Frequently asked questions

Alladurg is a solar photovoltaic facility located in India, with approximate coordinates 17.947000 N, 77.925000 E. It is likely in the state of Telangana or Maharashtra.

The Alladurg solar PV plant has an installed capacity of 11 megawatts (MW), placing it in the small-to-medium scale for utility solar installations in India.

Yes, the Alladurg solar PV plant is currently operational, contributing renewable electricity to the Indian grid.

India's solar PV sector is driven by the Jawaharlal Nehru National Solar Mission, state-level renewable purchase obligations, and a target of 500 GW non-fossil fuel capacity by 2030. Projects like Alladurg benefit from power purchase agreements and grid connectivity under these policies.

Solar PV generates electricity without greenhouse gas emissions or water consumption, reducing reliance on coal. It supports India's climate commitments and helps improve air quality by displacing fossil fuel generation.
UtilityRadar
More
Press Esc to close · Browse by sector