Overview
Amarpur Samavist is a 10 MW operational solar PV plant located in India. It contributes to the country's renewable energy capacity under national solar initiatives.
Amarpur Samavist is a solar photovoltaic (PV) power plant located in India, with an operational status and a capacity of 10 MW. This facility is part of India's growing solar energy infrastructure, which supports the nation's target of 500 GW of renewable energy capacity by 2030. The plant operates in a region with high solar irradiance, typical of central India, making it suitable for solar power generation. India's regulatory framework, including the Jawaharlal Nehru National Solar Mission and state-level renewable purchase obligations, provides a supportive environment for such projects. The 10 MW scale classifies it as a small-to-medium utility-scale solar installation. Environmentally, the plant displaces fossil fuel-based electricity, reducing greenhouse gas emissions. Solar PV systems have minimal water consumption and low operational emissions, though they require land use. The facility supports local grid stability and contributes to India's energy security and climate goals.
Environmental context
The plant is located in a region with semi-arid climate and high solar exposure, typical for central India. Solar PV installations have low water usage and no direct emissions during operation, but require land conversion. The facility helps reduce reliance on coal-fired power, which dominates India's energy mix, and supports local air quality improvements.
Frequently asked questions
Amarpur Samavist is a solar PV plant located in India, with coordinates approximately 24.7650° N, 78.4500° E, in the central part of the country.
Amarpur Samavist has an installed capacity of 10 megawatts (MW), making it a small-to-medium scale solar photovoltaic facility.
The plant uses solar photovoltaic (PV) technology to convert sunlight directly into electricity.
India's solar energy sector is supported by the Jawaharlal Nehru National Solar Mission, state-level renewable purchase obligations, and central financial incentives like accelerated depreciation and viability gap funding.
The plant adds 10 MW of clean energy capacity, helping India achieve its target of 500 GW of renewable energy by 2030 and reducing dependence on fossil fuels.