Solar PV Operational

BhSP2 Tata Solar PV Plant | 65 MW Facility in India

India
Visit official website

Overview

BhSP2 Tata is a 65 MW solar PV facility located in India. The plant is operational and contributes to the country's renewable energy capacity.

BhSP2 Tata is a solar photovoltaic (PV) power plant with a capacity of 65 megawatts, located in India. The facility is operational and plays a role in the country's growing renewable energy sector. India has set ambitious targets for solar energy under its National Solar Mission, aiming for 100 GW of solar capacity by 2022 and 500 GW of renewable energy by 2030. The plant operates under India's regulatory framework, which includes renewable purchase obligations (RPOs) and competitive bidding for solar tariffs. The 65 MW scale places it in the medium-to-large category for solar PV installations in India. The facility uses solar PV technology to convert sunlight into electricity, contributing to grid stability and reducing reliance on fossil fuels. BhSP2 Tata supports India's energy transition by generating clean electricity and reducing carbon emissions. The plant's output is fed into the regional grid, helping to meet the growing energy demand in the region. Solar PV plants like this one also have low operational costs and minimal water usage, making them environmentally beneficial compared to conventional power plants.

Environmental context

The plant is located in a region with high solar irradiance, typical of the Thar Desert area in Rajasthan. Solar PV installations in such arid regions have low water requirements and minimal land-use impact compared to other energy sources. However, large-scale solar farms can affect local ecosystems and wildlife habitats. The facility's design and operation likely include measures to mitigate dust accumulation and manage land use.

Frequently asked questions

BhSP2 Tata is a solar PV plant located in India, with coordinates approximately 27.496° N, 71.953° E, likely in the state of Rajasthan.

BhSP2 Tata has a capacity of 65 megawatts (MW), making it a medium-to-large scale solar PV facility.

It is part of the Tata group's renewable energy portfolio.

Solar PV plants in India operate under the National Solar Mission, renewable purchase obligations (RPOs), and competitive bidding for tariffs. The government targets 500 GW of renewable energy by 2030.

BhSP2 Tata generates clean electricity, reducing carbon emissions and supporting India's target of 500 GW renewable capacity by 2030. It also helps meet regional energy demand.
UtilityRadar