Overview
ChSP Tata is a 25 MW operational solar PV facility located in India. It contributes to the country's renewable energy capacity under national solar targets.
ChSP Tata is a solar photovoltaic (PV) power plant located in India, with an operational capacity of 25 megawatts. The facility is situated at coordinates 23.929°N, 71.206°E, in a region well-suited for solar energy generation due to high solar irradiance. As a utility-scale solar installation, it plays a role in India's growing renewable energy portfolio. The plant operates under India's national renewable energy framework, which includes targets under the National Solar Mission and state-level Renewable Purchase Obligations (RPOs). With a capacity of 25 MW, it falls into the medium-scale category for solar PV in India. The facility uses standard solar PV technology to convert sunlight into electricity, feeding into the regional grid. ChSP Tata supports India's goal of achieving 500 GW of non-fossil fuel capacity by 2030. By generating clean electricity, it helps reduce greenhouse gas emissions and dependence on fossil fuels. The plant's operational status ensures ongoing contribution to local energy needs and grid stability.
Environmental context
The facility is located in a region with high solar insolation, typical of arid or semi-arid climates in western India. Solar PV installations like ChSP Tata have a low environmental footprint during operation, with no emissions or water consumption. However, land use for solar farms can impact local ecosystems, and careful siting is needed to avoid sensitive habitats. The plant's location in a non-forested area minimizes ecological disruption.
Frequently asked questions
ChSP Tata is a solar PV plant located in India at coordinates 23.929°N, 71.206°E.
ChSP Tata has an operational capacity of 25 megawatts (MW), making it a medium-scale solar installation.
The operator of ChSP Tata is not publicly listed, but the plant is operational and contributes to India's grid.
India's solar energy sector is supported by the National Solar Mission, state-level Renewable Purchase Obligations (RPOs), and targets to achieve 500 GW of non-fossil fuel capacity by 2030.
ChSP Tata generates clean electricity from solar energy, reducing greenhouse gas emissions and reliance on fossil fuels, with minimal operational environmental impact.