Overview
ChSP Torrent is a 51 MW solar PV facility located in India. The plant is operational and contributes to the country's renewable energy capacity.
ChSP Torrent is a solar photovoltaic (PV) power plant located in India, with a capacity of 51 megawatts (MW). The facility is operational and plays a role in India's growing renewable energy sector, which is supported by national targets and policies such as the National Solar Mission and state-level renewable purchase obligations. The plant uses solar PV technology to convert sunlight into electricity. With a capacity of 51 MW, it falls within the medium-scale range for solar farms in India. The facility operates under India's regulatory framework, which includes competitive bidding for solar tariffs and grid connectivity standards set by the Central Electricity Regulatory Commission. The electricity generated by ChSP Torrent is fed into the regional grid, helping to meet local demand and reduce reliance on fossil fuels. Solar PV plants like this one contribute to India's goal of achieving 500 GW of non-fossil fuel capacity by 2030, while also supporting energy security and reducing carbon emissions.
Environmental context
The plant is located in a region with high solar irradiance, typical of western India, which is favorable for solar energy generation. Solar PV installations have a low environmental footprint during operation, with no emissions or water consumption. However, land use for solar farms can impact local ecosystems and agriculture. The facility's location in a semi-arid area may minimize land-use conflicts.
Frequently asked questions
ChSP Torrent is a solar PV power plant located in India, with coordinates approximately 23.8930° N, 71.2110° E.
ChSP Torrent has a capacity of 51 megawatts (MW), making it a medium-scale solar photovoltaic facility.
The plant uses solar photovoltaic (PV) technology to convert sunlight into electricity.
India's solar energy sector is supported by the National Solar Mission, state-level renewable purchase obligations (RPOs), and competitive bidding for tariffs, overseen by the Central Electricity Regulatory Commission.
The plant adds 51 MW of solar capacity, supporting India's goal of 500 GW of non-fossil fuel capacity by 2030 and reducing carbon emissions.