Overview
Kamalpur SUTIP is a 24.1 MW solar PV plant located in India. It is operational and contributes to the country's renewable energy capacity.
Kamalpur SUTIP is a solar photovoltaic (PV) power plant located in India, with a capacity of 24.1 megawatts (MW). The facility is operational and plays a role in India's growing renewable energy sector, which is supported by national policies such as the Jawaharlal Nehru National Solar Mission and state-level renewable energy targets. The plant uses solar PV technology to convert sunlight into electricity. With a capacity of 24.1 MW, it falls into the medium-scale category for solar installations in India. The facility operates under India's regulatory framework, which includes renewable purchase obligations (RPOs) and competitive bidding mechanisms that have driven down solar tariffs significantly. Kamalpur SUTIP contributes to India's goal of achieving 500 GW of non-fossil fuel capacity by 2030. Solar PV plants like this one help reduce greenhouse gas emissions and support energy security by diversifying the energy mix. The plant's location in Gujarat, a state with high solar irradiance, enhances its efficiency and output.
Environmental context
Solar PV plants like Kamalpur SUTIP have a low environmental footprint during operation, producing no direct emissions. However, they require land for installation, which can impact local ecosystems. In arid regions of Gujarat, solar farms may affect desert habitats and wildlife. Proper siting and mitigation measures, such as maintaining vegetation and avoiding sensitive areas, can minimize these impacts.
Frequently asked questions
Kamalpur SUTIP is located in India, with coordinates approximately 23.0490 N, 71.8690 E, likely in the state of Gujarat.
Kamalpur SUTIP has a capacity of 24.1 megawatts (MW), making it a medium-scale solar PV plant.
Kamalpur SUTIP uses solar photovoltaic (PV) technology to generate electricity from sunlight.
India supports solar energy through policies such as the National Solar Mission, renewable purchase obligations (RPOs), and competitive bidding for tariffs, which have driven rapid solar capacity growth.
Solar PV plants have low operational emissions but require land, which can affect local habitats. In Gujarat, careful site selection helps minimize ecological disruption.