Overview
Manarchak is a 5 MW operational solar PV facility located in India. It contributes to the country's growing renewable energy capacity under national solar targets.
Manarchak is a solar photovoltaic (PV) power plant located in India, with coordinates 23.465° N, 91.275° E. The facility has an installed capacity of 5 megawatts (MW) and is currently operational. As a solar PV installation, it converts sunlight directly into electricity, supporting India's transition to cleaner energy sources. The plant operates within India's robust renewable energy framework, which includes national targets under the Jawaharlal Nehru National Solar Mission and state-level Renewable Purchase Obligations (RPOs). India aims to achieve 500 GW of non-fossil fuel capacity by 2030, with solar power playing a central role. The 5 MW scale places Manarchak in the small-to-medium category for utility-scale solar projects in India. Environmentally, the facility contributes to reducing greenhouse gas emissions by displacing fossil-fuel-based electricity. Solar PV plants have minimal water consumption and low operational emissions, though they require land for installation. The plant's location in eastern India benefits from high solar irradiance, supporting efficient energy generation and grid integration.
Environmental context
Solar PV plants like Manarchak have a low environmental footprint during operation, with no air emissions or water usage. However, land use for solar arrays can impact local ecosystems and agriculture. In India, solar development is often sited on wasteland or degraded land to minimize conflicts. The facility's location in a region with high solar potential supports clean energy generation without significant water stress.
Frequently asked questions
The Manarchak solar PV plant is located in India at coordinates 23.465° N, 91.275° E.
The Manarchak solar plant has an installed capacity of 5 megawatts (MW).
Yes, the Manarchak solar plant is currently operational.
India's solar energy sector is supported by the Jawaharlal Nehru National Solar Mission, state-level Renewable Purchase Obligations (RPOs), and a target of 500 GW non-fossil fuel capacity by 2030.
A 5 MW solar plant can power approximately 1,500 to 2,000 households annually, reducing reliance on fossil fuels and lowering carbon emissions.